Hi, I need to start a process before the tests run, and terminate it after the tests run. A module with a shared static constructor and shared static destructor sounds like the way of doing this since the constructor is run before main and the destructor after main. However I am using unit-threaded, not for the threads but because it is great for a whole load of other reasons. In fact the threads are becoming a problem.
As far as I can tell main is terminating before all the tests are complete which means the shared static destructor is executing before all the tests are complete. To test this hypothesis I want to run single threaded. unit-threaded says this is possible using a command line option -s. The question is which command line? dub test doesn't accept it and neither does the dub command creating ut_main.d -- Russel. =========================================== Dr Russel Winder t: +44 20 7585 2200 41 Buckmaster Road m: +44 7770 465 077 London SW11 1EN, UK w: www.russel.org.uk
signature.asc
Description: This is a digitally signed message part