Hi,

I need to start a process before the tests run, and terminate it after
the tests run. A module with a shared static constructor and shared
static destructor sounds like the way of doing this since the
constructor is run before main and the destructor after main. However I
am using unit-threaded, not for the threads but because it is great for
a whole load of other reasons. In fact the threads are becoming a
problem.

As far as I can tell main is terminating before all the tests are
complete which means the shared static destructor is executing before
all the tests are complete.

To test this hypothesis I want to run single threaded. unit-threaded
says this is possible using a command line option -s. The question is
which command line? dub test doesn't accept it and neither does the dub
command creating ut_main.d

-- 
Russel.
===========================================
Dr Russel Winder      t: +44 20 7585 2200
41 Buckmaster Road    m: +44 7770 465 077
London SW11 1EN, UK   w: www.russel.org.uk

Attachment: signature.asc
Description: This is a digitally signed message part

Reply via email to