On Tue, 2007-03-06 at 17:39 -0500, Joseph Perla wrote: > They don't need to be in 0.96, but can someone at least check in the > tickets already decided as ready for check-in? > http://code.djangoproject.com/query?status=new&status=assigned&status=reopened&stage=Ready+for+checkin > Some of these have been complete and ready for 2 months.
Unsurprisingly, that particular report does get checked very regularly. In our effort to streamline the triage project, it is important to realise that some slightly different states have been collapsed into each other and "ready for checkin" does not mean "can be checked in without further thought". It really means that the patch looks reasonable (to the traigers) and reasonable tests and docs are in available, if appropriate. A bunch of them have subsequently been notated as waiting until after 0.96 or they are for another branch. Some others are not no-brainers, so require some thought and for a committer to have a block of time available to drop them in. Note that a lot of tickets from that stage have been committed over the past four weeks or so. So don't just look at the number of tickets. From a quick scan, I couldn't find any that have been marked as "ready" for over 2 months that are not waiting on something else. Regards, Malcolm --~--~---------~--~----~------------~-------~--~----~ You received this message because you are subscribed to the Google Groups "Django developers" group. To post to this group, send email to django-developers@googlegroups.com To unsubscribe from this group, send email to [EMAIL PROTECTED] For more options, visit this group at http://groups.google.com/group/django-developers?hl=en -~----------~----~----~----~------~----~------~--~---