Thanks Lars for replying. I don't have problem in upgrading DRBD to 8.4 but I 
am worried about data. Since two nodes are out of sync will upgrade on 
secondary (removing 8.3 and installing 8.4) will force sync to finish?  If it 
doesn't happen how should I approach primary upgrade? 

From: [email protected]
To: [email protected]
Subject: DRBD 8.3.13 Sync getting stalled with RHEL 6
Date: Mon, 21 Oct 2013 19:04:04 +0530




Hi Friends,

I have already a DRBD 8.3.13 setup running on RHEL 6 servers. After recent 
kernel upgrade to 2.6.32-358.18.1.el6.x86_64, DRBD sync got stalled on the 
server. I have tried to invalidate secondary and start the sync but sync is 
alway 100% mark.

[root@PdCuLx0503p ~]# cat /proc/drbd
version: 8.3.13 (api:88/proto:86-96)
GIT-hash: 83ca112086600faacab2f157bc5a9324f7bd7f77 build by dag@Build64R6, 
2012-09-04 12:06:10
 0: cs:SyncSource ro:Primary/Secondary ds:UpToDate/Inconsistent C r-----
    ns:92498284 nr:0 dw:92499372 dr:170166401 al:114209 bm:70 lo:0 pe:0 ua:0 
ap:0 ep:1 wo:b oos:44
        [===================>] sync'ed:100.0% (44/276)K
        finish: 8:25:29 speed: 0 (0) K/sec (stalled)
[root@PdCuLx0503p ~]#


I tried to install same version on non production RHEL6 servers but in that 
also Initial syncs are getting stalled. Is 8.3.13 supported on kernel 
2.6.32-358.18.1 and later?
                                                                                
  
_______________________________________________
drbd-user mailing list
[email protected]
http://lists.linbit.com/mailman/listinfo/drbd-user

Reply via email to