[ 
http://jira.dspace.org/jira/browse/DS-523?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Jeffrey Trimble closed DS-523.
------------------------------

    Documentation Status: Complete or Committed  (was: Needed)
              Resolution: Fixed

Step 9 moved to end and is now step 12.

> Reordering of 1.5 -> 1.6 upgrade steps in DSpace manual
> -------------------------------------------------------
>
>                 Key: DS-523
>                 URL: http://jira.dspace.org/jira/browse/DS-523
>             Project: DSpace 1.x
>          Issue Type: Bug
>          Components: Documentation
>    Affects Versions: 1.6.0
>            Reporter: Stuart Lewis
>            Assignee: Jeffrey Trimble
>             Fix For: 1.6.1
>
>
> Step 9 of the upgrade doc says how to bulk load dspace.log stats in solr. 
> However the solr webapp isn't deployed and started until steps 11 and 12. 
> Step 9 needs moving to the end of the list of steps.
> Reported by Yin Yin Latt (The University of Auckland Library)

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: 
http://jira.dspace.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

------------------------------------------------------------------------------

_______________________________________________
Dspace-devel mailing list
Dspace-devel@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/dspace-devel

Reply via email to