I think this is a bug and I can't find mention of it on GitHub or in the group but want to confirm before I file my first Issue.
When creating a new process through the Admin sidebar menu, the cancel button does not always cancel; in some circumstances it behaves identically to the Save button; ie the green "process successfully created" message appears and the process begins running. In some circumstances, cancel does work. E.g., if no process has been selected from the drop-down. But if a selection has been made, and there are no errors such as missing required parameters/values, canceling = saving. ~Amy -- All messages to this mailing list should adhere to the Code of Conduct: https://www.lyrasis.org/about/Pages/Code-of-Conduct.aspx --- You received this message because you are subscribed to the Google Groups "DSpace Technical Support" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To view this discussion on the web visit https://groups.google.com/d/msgid/dspace-tech/07cd7d7a-043a-444d-b9d2-835db7822f5bn%40googlegroups.com.
