Mike:

If you look at the schematic, you'll see that pin 3 of T6 is attached to pin 2 of T6. You should get continuity between all leads. If you DON'T, something is wrong. Continue with your building...

73's,

John AA0VE

Mike wrote:

I just finished installing T6 on the RF board, and did continuity checks just 
like all the other toroids up to this point.  I found continuity existing 
between all leads.

By all visual inspections, it appears to be no shorts anywhere.

Is this normal for T6?

Thanks,
Mike, NJ2OM

_______________________________________________
Elecraft mailing list
Post to: Elecraft@mailman.qth.net
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com

Reply via email to