Mike:
If you look at the schematic, you'll see that pin 3 of T6 is attached to
pin 2 of T6. You should get continuity between all leads. If you
DON'T, something is wrong. Continue with your building...
73's,
John AA0VE
Mike wrote:
I just finished installing T6 on the RF board, and did continuity checks just
like all the other toroids up to this point. I found continuity existing
between all leads.
By all visual inspections, it appears to be no shorts anywhere.
Is this normal for T6?
Thanks,
Mike, NJ2OM
_______________________________________________
Elecraft mailing list
Post to: Elecraft@mailman.qth.net
You must be a subscriber to post to the list.
Subscriber Info (Addr. Change, sub, unsub etc.):
http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/subscribers.htm
Elecraft web page: http://www.elecraft.com