Jeffrey,

I agree with David's view. The Altitude and Temp/Humidity requirements
should be "AND-ed" requirements not "OR-ed" to reflect realistic deployment
scenarios. 

In reality, thermal analysis experts tell me that altitude does not really
affect the thermal performance significantly so you should be able to pass
at sea level or at 4000m equally easily (or not so easily!). The loss of
heat carrying capability due to the decreased air density is off-set, at
least somewhat, by the loss of pressure needed to move the air (recall the
fan speed curve).

Marko Radojicic
email: ma...@caspiannetworks.com
phone: 408/382-5206
fax: 408/382-5593



-----Original Message-----
From: David Spencer [mailto:dspen...@oresis.com]
Sent: Monday, September 25, 2000 9:42 AM
To: 'Collins, Jeffrey'; 'emc-p...@ieee.org '
Subject: RE: NEBS: GR-63 Altitude Test Profile



Hi Jeffrey,
Our friends at Telcordia do seem to enjoy listing requirements where we
would least expect them.  GR63 is no exception.  For altitude, the limits
called out in R4-8 [74] and O4-10[76] for Table 4-4 are the general
temperature/humidity limits for long and short term exposure.  The
application of those criteria can be found in Table 4.5 in the 182 hour
profile.

It is my belief that you test to at 4000m using the profile from table 4.5,
unless you wanted to make a profile of your own that covered the same ground
over a longer period of time, using Table 4-4 for the limits, rates of
change, and duration.  If the EUT cannot tolerate the resulting temperature
rise from the 4000m altitude, it will be necessary to retest at 1800 to meet
R4-8.  The failure is documented in the NEBS data submitted to the carrier
who decides if it is something he wants you to do something about before he
purchases you equipment.  I do not think it is necessary to test 1800m if
you have passed the table 4-5 profile at 4000m.

Don't forget: Objective requirements are not elective.  The tests must be
performed and the results documented.  It is by this means that decisions
are made about making the objective a mandatory requirement down the road.

Good Luck!
Dave Spencer     Compliance Engineer
Oresis Communications, Inc.
14670 NW Greenbrier Parkway, Beaverton, OR  97006
* dspen...@oresis.com  * http://www.oresis.com
* (503) 466-6289  * (503) 533-8233  



-----Original Message-----
From: Collins, Jeffrey [mailto:jcoll...@ciena.com]
Sent: Monday, September 25, 2000 6:36 AM
To: 'emc-p...@ieee.org '
Subject: NEBS: GR-63 Altitude Test Profile



Group,

GR-63 sections 4.1.3  &  5.1 do not give a definitive testing profile for
Altitude testing. If you have completed this test what profile did you use?
Is there a customer specification from an RBOC or CLEC that you found to be
definitive. It appears that by only addressing these sections you could have
to retest down the road for a customer located in a high altitude
environment.  Which Telco has the most stringent internal specifications for
this test?

Points to be considered are:

*  Max Altitude
4000m

*  Temperature at max Altitude
Profile in Table 4-5

*  Relative Humidity
Profile in Table 4-5

*  Length of time at Max Altitude
182 hrs


Thanks in advance,


Jeffrey Collins 
MTS, Principal Compliance Engineer
Ciena Core Switching Division
jcoll...@ciena.com
www.ciena.com


-------------------------------------------
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.

To cancel your subscription, send mail to:
     majord...@ieee.org
with the single line:
     unsubscribe emc-pstc

For help, send mail to the list administrators:
     Jim Bacher:              jim_bac...@mail.monarch.com
     Michael Garretson:        pstc_ad...@garretson.org

For policy questions, send mail to:
     Richard Nute:           ri...@ieee.org


-------------------------------------------
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.

To cancel your subscription, send mail to:
     majord...@ieee.org
with the single line:
     unsubscribe emc-pstc

For help, send mail to the list administrators:
     Jim Bacher:              jim_bac...@mail.monarch.com
     Michael Garretson:        pstc_ad...@garretson.org

For policy questions, send mail to:
     Richard Nute:           ri...@ieee.org


-------------------------------------------
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.

To cancel your subscription, send mail to:
     majord...@ieee.org
with the single line:
     unsubscribe emc-pstc

For help, send mail to the list administrators:
     Jim Bacher:              jim_bac...@mail.monarch.com
     Michael Garretson:        pstc_ad...@garretson.org

For policy questions, send mail to:
     Richard Nute:           ri...@ieee.org

Reply via email to