Jody: There never was any specified time, either min or max, between the 2/20 surges on the power line. Most surge equipment needs some time to re-charge the capacitors before being discharges. This may take up to a minute before the next surge can be applied. Thus, anything between 30 seconds to a minute or so should be acceptable. By the way. The proper reference should be to the TIA-968-A rather than 47CFR Part 68. Note that there are three admendments to this document. While we are on the subject, does anyone thing that there should be a specified time between the surges (or a min/max value)? John Shinn, P.E. Manager, Laboratory Operations Sanmina-SCI
From: [email protected] [mailto:[email protected]] On Behalf Of Leber Jody-G19980 Sent: Thursday, August 04, 2005 7:36 AM To: [email protected] Subject: Old Surge Tests All, A history test follows: Reviewing FCC Part 68 (10-1-98 Edition) and Bellcore GR-1089 (Issue 2, 1997), I am not able to identify any specific requirements for the time between pulses of the 2.5 kV, 2/10 us surge test. Were there any requirements on time between surge applications? Best Regards, Jody Leber Senior Regulatory Engineer [email protected] http://www.motorola.com/producttesting Motorola Product Testing Services 1700 Belle Meade Court Lawrenceville, GA 30043 770.338.3581 P 678.201.7270 C 847.761.3145 F _____________________________________________________________________________ Scanned by Sanmina-SCI eShield ________ ____________________________________________________________________ ---------------------------------------------------------------- This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. Website: http://www.ieee-pses.org/ To post a message to the list, send your e-mail to [email protected] Instructions: http://listserv.ieee.org/listserv/request/user-guide.html List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Scott Douglas [email protected] Mike Cantwell [email protected] For policy questions, send mail to: Richard Nute: [email protected] Jim Bacher: [email protected] All emc-pstc postings are archived and searchable on the web at: http://www.ieeecommunities.org/emc-pstc

