For some years, whatever is finally agreed, UK will observe the same docopocoss as Europe. After that period, UK might set its own docopocoss, but almost certainly won't do that without a very good reason (e.g. if UK decides that the new standard is required to be applied urgently, or more time is required for industry to adapt to the new standard).

Docopocoss = Date of cessation of presumption of conformity of superseded standard. This is the only date that actually matters in terms of complying with the associated Directive or Regulation.

Best wishes
John Woodgate OOO-Own Opinions Only
J M Woodgate and Associates www.woodjohn.uk
Rayleigh, Essex UK

On 2019-09-12 04:38, Scott Xe wrote:
John,

After Brexit, is there a body like European Forward or OJEU to set up the in-force date and deadline to replace the current standard for a new or revised standard?  It is a similar situation of UK standard before joining EU?

Regards,

Scott


On Wed, 11 Sep 2019 at 17:17, John Woodgate <j...@woodjohn.uk <mailto:j...@woodjohn.uk>> wrote:

    Since BSI will still be a member of CENELEC and CEN (and ETSI),
    the European Foreword will still be included. It's a 'standards
    body' element, not something inserted by the European Commission.

    Best wishes
    John Woodgate OOO-Own Opinions Only
    J M Woodgate and Associateswww.woodjohn.uk  <http://www.woodjohn.uk>
    Rayleigh, Essex UK

    On 2019-09-11 10:07, Scott Xe wrote:
    John,

    Thanks for your advice!  When will we use the National Forward? 
    After Brexit, the European Forward may not exist in BS standard,
    will the National Forward take place instead?

    Best regards,

    Scott


    On Wed, 11 Sep 2019 at 00:41, John Woodgate <j...@woodjohn.uk
    <mailto:j...@woodjohn.uk>> wrote:

        It is not a correct interpretation of 'no transition period'.
        The European Foreword is correct, except that in rare cases,
        the European Commission sets a different date from that set
        by CENELEC, in which case the Commission's date applies.

        Your last sentence is correct. Docopocoss rules!

        Best wishes
        John Woodgate OOO-Own Opinions Only
        J M Woodgate and Associateswww.woodjohn.uk  <http://www.woodjohn.uk>
        Rayleigh, Essex UK

        On 2019-09-10 17:15, Scott Xe wrote:

        I have a query about the transition period in BS EN standard
        and seeking advice how to correctly interpret the transition
        period based on the EU normal application.


        For example of BS EN 60086-4 2019

        In European Forward of the standard, the dop is 2020-02-28
        and dow 2022-05-30.  Transition period is 32 months for
        adopting both old and new standards in parallel.  The
        revised standard must be published no later than 2020-02-28
        and the deadline to replace the old standard with the new
        one is 2022-05-30.

        In National Forward of BS EN IEC standard, BS EN IEC 60086-4
        2019 supersedes BS EN 60086-04 2015, which is withdrawn.  In
        the UK, the old standard is replaced with the new standard
        as soon as it is published.  Is it a correct interpretation
        of no transition period? It seems to be not in line with
        above European level and below harmonized standards which
        both have transition periods.  In addition, the
        implementation dates may vary by each member state of EU
        causing unnecessary confusion.

        For harmonized standards, we have to follow the first
        publication OJ and Date of cessation of presumption of
        conformity of superseded standard in OJEU regardless of
        above application dates in standard.


        Thanks and regards,


        Scott

        -
        ----------------------------------------------------------------

        This message is from the IEEE Product Safety Engineering
        Society emc-pstc discussion list. To post a message to the
        list, send your e-mail to <emc-p...@ieee.org
        <mailto:emc-p...@ieee.org>>

        All emc-pstc postings are archived and searchable on the web
        at: http://www.ieee-pses.org/emc-pstc.html

        Attachments are not permitted but the IEEE PSES Online
        Communities site at http://product-compliance.oc.ieee.org/
        can be used for graphics (in well-used formats), large
        files, etc.

        Website: http://www.ieee-pses.org/
        Instructions: http://www.ieee-pses.org/list.html (including
        how to unsubscribe)
        List rules: http://www.ieee-pses.org/listrules.html

        For help, send mail to the list administrators:
        Scott Douglas <sdoug...@ieee.org <mailto:sdoug...@ieee.org>>
        Mike Cantwell <mcantw...@ieee.org <mailto:mcantw...@ieee.org>>

        For policy questions, send mail to:
        Jim Bacher <j.bac...@ieee.org <mailto:j.bac...@ieee.org>>
        David Heald <dhe...@gmail.com <mailto:dhe...@gmail.com>>

    -
    ----------------------------------------------------------------

    This message is from the IEEE Product Safety Engineering Society
    emc-pstc discussion list. To post a message to the list, send
    your e-mail to <emc-p...@ieee.org <mailto:emc-p...@ieee.org>>

    All emc-pstc postings are archived and searchable on the web at:
    http://www.ieee-pses.org/emc-pstc.html

    Attachments are not permitted but the IEEE PSES Online
    Communities site at http://product-compliance.oc.ieee.org/ can be
    used for graphics (in well-used formats), large files, etc.

    Website: http://www.ieee-pses.org/
    Instructions: http://www.ieee-pses.org/list.html (including how
    to unsubscribe)
    List rules: http://www.ieee-pses.org/listrules.html

    For help, send mail to the list administrators:
    Scott Douglas <sdoug...@ieee.org <mailto:sdoug...@ieee.org>>
    Mike Cantwell <mcantw...@ieee.org <mailto:mcantw...@ieee.org>>

    For policy questions, send mail to:
    Jim Bacher <j.bac...@ieee.org <mailto:j.bac...@ieee.org>>
    David Heald <dhe...@gmail.com <mailto:dhe...@gmail.com>>


-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc discussion 
list. To post a message to the list, send your e-mail to <emc-p...@ieee.org>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieee-pses.org/emc-pstc.html

Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.

Website:  http://www.ieee-pses.org/
Instructions:  http://www.ieee-pses.org/list.html (including how to unsubscribe)
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas <sdoug...@ieee.org>
Mike Cantwell <mcantw...@ieee.org>

For policy questions, send mail to:
Jim Bacher:  <j.bac...@ieee.org>
David Heald: <dhe...@gmail.com>

Reply via email to