Amund,                I believe that we agree in principle.  

I am not proposing that the test report include everything that is not covered 
(a tricky business) but, rather, that it include a simple statement such as: 
this product has been evaluated as a mains product throughout and the detailed 
review of the usual isolation/insulation has not been done.   (I’m sure you 
could come up with more inclusive wording, but in the end, the reader is put on 
notice as to the restricted applicability of the evaluation.) 

 

This is a good exercise in adapting the requirements of the standard to a 
specific application.  I’m pleased that we examined this in this forum.  

 

:>)     br,      Pete

 

Peter E Perkins, PE

Principal Product Safety & Regulatory Affairs Consultant

PO Box 1067

Albany, ORe  97321-0413

 

503/452-1201

 

IEEE Life Fellow

IEEE PSES 2020 Distinguished Lecturer

 <http://www.researchgate.net/Peter%20Perkins> www.researchgate.net search my 
name

 <mailto:p.perk...@ieee.org> p.perk...@ieee.org

 

 

Entropy ain’t what it used to be

 

From: Amund Westin <am...@westin-emission.no> 
Sent: Tuesday, September 14, 2021 11:39 PM
To: EMC-PSTC@LISTSERV.IEEE.ORG
Subject: [PSES] SV: [PSES] Creepage and clearance requirements

 

Pete,

I can follow your thoughts and that special things can happen with such a 
product in the long run. But the manufacturer will probably make designs that 
support product functionality and design as original intended. Taking into 
account future new development of HW and other functionalities will probably 
not be relevant due to, among other things, costs. But I recognize that 
increasing distances from 2mm to 6mm should not be cost driven. But if this is 
to be done after the product's first version is launched, then it will mean new 
pcb layouts and components with the costs that follow. It is not known whether 
UL or Nemko or other accredited test laboratories will point out in their test 
report that the design will not be approved if you later connect I / O lines to 
the secondary circuits on the product. If a new manufacturer or company were to 
introduce such product changes without making sure that they could reuse the 
design without having to make any changes to the original design, it must be 
said to be a strange approach. But if it is either written in test reports or 
in other documentation that safety only applies to products as it appears, then 
it is of course positive.

 

Best regards Amund

 

Fra: Pete Perkins 
Sendt: 14. september 2021 16:51
Til: EMC-PSTC@LISTSERV.IEEE.ORG <mailto:EMC-PSTC@LISTSERV.IEEE.ORG> 
Emne: Re: [PSES] Creepage and clearance requirements

 

Amund,                I support Rich’s approach.  

 

               It does leave a lingering question, though.  (removing my rose 
colored glasses and putting on my dark, pessimistic glasses)

 

               Imagine a downstream case such as this:  The unit works well and 
is popular.  A customer request comes to the manufacturer something to the 
effect that the unit works well except does not provide the full operational 
reliability in cases where there is significant EMC generated in the use area; 
they ask for an output (USB , PoE, etc) so that they can cable connect the unit 
for these applications.  A (different) company designer believes that this is 
easy to do and starts to work on this project.  If you are lucky, he consults 
the earlier safety lab report to understand the details to properly implement 
this.  

               Where in the report do you clearly state that the requirements, 
including isolation/insulation (creepage and clearance) were not evaluated and 
the ‘secondary’ is considered mains in a clear way?   

               With this understanding the designer will know that the full 
mains isolation/insulation will have to be done for the output circuit since it 
wasn’t done for the mains/secondary interface initially.  (Since, reasonably 
often, the unit won’t meet the mains/secondary requirements in some way and the 
manufacturer will not be willing to change it in this redesign cycle.)

               If this is not clearly taken care of initially then the process 
starts down the slippery slope of believing that everything was completed 
earlier and not fully reviewed at the modification step.  If not caught by the 
designer then the test lab catch will be a major complication in the project 
schedule.  If not caught by the test lab (your associate down the hall) then 
the product is inadequate and does not meet the requirements of the standard; 
hopefully this gets caught in the review but what if it doesn’t?

 

               My point is that simplifications need to be clearly stated in 
the documentation for downstream users.  Don’t leave anything to chance.  

 

:>)     br,      Pete

 

Peter E Perkins, PE

Principal Product Safety & Regulatory Affairs Consultant

PO Box 1067

Albany, ORe  97321-0413

 

503/452-1201

 

IEEE Life Fellow

IEEE PSES 2020 Distinguished Lecturer

 <http://www.researchgate.net/Peter%20Perkins> www.researchgate.net search my 
name

 <mailto:p.perk...@ieee.org> p.perk...@ieee.org

 

 

Entropy ain’t what it used to be

 

From: Richard Nute <ri...@ieee.org <mailto:ri...@ieee.org> > 
Sent: Sunday, September 12, 2021 3:05 PM
To: EMC-PSTC@LISTSERV.IEEE.ORG <mailto:EMC-PSTC@LISTSERV.IEEE.ORG> 
Subject: Re: [PSES] Creepage and clearance requirements

 

 

 

Hi Amund:

 

If no accessible conductive parts, then you can designate the secondary 
circuits as part of the primary circuits, which means there is no need for 
isolation between primary and secondary circuits.  No creepage or clearance 
requirements!  OVC would not apply primary-to-(a primary) secondary.

 

The plastic enclosure would probably constitute reinforced insulation 
throughout.  For electric shock, you would wrap in foil and measure touch 
current.  Should be comfortably below the limit.  And, you would need to do a 
dielectric test to the same foil at twice the voltage necessary for basic 
insulation.  Should easily pass.

 

I have assumed the antenna is within the enclosure so no accessible conductive 
parts.  If the antenna is an accessible conductive part, then the above 
scenario is not valid.  

 

Stay safe, and best regards,

Rich

 

 

 

 

From: Amund Westin <am...@westin-emission.no <mailto:am...@westin-emission.no> 
> 
Sent: Sunday, September 12, 2021 10:16 AM
To: EMC-PSTC@LISTSERV.IEEE.ORG <mailto:EMC-PSTC@LISTSERV.IEEE.ORG> 
Subject: [PSES] Creepage and clearance requirements

 

IEC60950-1:

 

How about the Creepage and clearance requirements for an AC driven radio HUB 
device. 

 

*       One input: 230VAC (direct into wall socket)
*       No physical output ports, just radio communication.
*       Insulated plastic enclosure (UL94 V-0)

 

The Creepage and clearance requirements between primary and secondary circuits, 
does it make any sense as long as the device has no cables and is encapsulated 
by a plastic enclosure

I understand that there should be some Creepage and clearance to withstand OVC 
II (250V transient).

 

Best regards Amund

 

 

-
----------------------------------------------------------------

This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<emc-p...@ieee.org <mailto:emc-p...@ieee.org> >

All emc-pstc postings are archived and searchable on the web at: 
http://www.ieee-pses.org/emc-pstc.html

Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.

Website: http://www.ieee-pses.org/
Instructions: http://www.ieee-pses.org/list.html (including how to unsubscribe) 
<http://www.ieee-pses.org/list.html> 
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas <sdoug...@ieee.org <mailto:sdoug...@ieee.org> >
Mike Cantwell <mcantw...@ieee.org <mailto:mcantw...@ieee.org> > 

For policy questions, send mail to:
Jim Bacher <j.bac...@ieee.org <mailto:j.bac...@ieee.org> >
David Heald <dhe...@gmail.com <mailto:dhe...@gmail.com> > 

-
----------------------------------------------------------------

This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<emc-p...@ieee.org <mailto:emc-p...@ieee.org> >

All emc-pstc postings are archived and searchable on the web at: 
http://www.ieee-pses.org/emc-pstc.html

Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.

Website: http://www.ieee-pses.org/
Instructions: http://www.ieee-pses.org/list.html (including how to unsubscribe) 
<http://www.ieee-pses.org/list.html> 
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas <sdoug...@ieee.org <mailto:sdoug...@ieee.org> >
Mike Cantwell <mcantw...@ieee.org <mailto:mcantw...@ieee.org> > 

For policy questions, send mail to:
Jim Bacher <j.bac...@ieee.org <mailto:j.bac...@ieee.org> >
David Heald <dhe...@gmail.com <mailto:dhe...@gmail.com> > 

-
----------------------------------------------------------------

This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<emc-p...@ieee.org <mailto:emc-p...@ieee.org> >

All emc-pstc postings are archived and searchable on the web at: 
http://www.ieee-pses.org/emc-pstc.html

Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.

Website: http://www.ieee-pses.org/
Instructions: http://www.ieee-pses.org/list.html (including how to unsubscribe) 
<http://www.ieee-pses.org/list.html> 
List rules: http://www.ieee-pses.org/listrules.html 

For help, send mail to the list administrators:
Scott Douglas <sdoug...@ieee.org <mailto:sdoug...@ieee.org> >
Mike Cantwell <mcantw...@ieee.org <mailto:mcantw...@ieee.org> > 

For policy questions, send mail to:
Jim Bacher <j.bac...@ieee.org <mailto:j.bac...@ieee.org> >
David Heald <dhe...@gmail.com <mailto:dhe...@gmail.com> > 


-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
<emc-p...@ieee.org>

All emc-pstc postings are archived and searchable on the web at:
http://www.ieee-pses.org/emc-pstc.html

Attachments are not permitted but the IEEE PSES Online Communities site at 
http://product-compliance.oc.ieee.org/ can be used for graphics (in well-used 
formats), large files, etc.

Website:  http://www.ieee-pses.org/
Instructions:  http://www.ieee-pses.org/list.html (including how to unsubscribe)
List rules: http://www.ieee-pses.org/listrules.html

For help, send mail to the list administrators:
Scott Douglas <sdoug...@ieee.org>
Mike Cantwell <mcantw...@ieee.org>

For policy questions, send mail to:
Jim Bacher:  <j.bac...@ieee.org>
David Heald: <dhe...@gmail.com>

Reply via email to