Hi Folks,

I’ve been working the MPE calcs for the SRC project.

LMK if we already have a template for this. I don’t want to re-do/override what 
is already in-practice.

Thanks,

Mike


Michael F. Violette, P.E.
IEEE Senior Engineer
iNARTE-Certified Engineer
+1 240 401 1388
Washington Laboratories
[email protected]<mailto:[email protected]>
[signature_2895462905]
wll.com


-
----------------------------------------------------------------
This message is from the IEEE Product Safety Engineering Society emc-pstc 
discussion list. To post a message to the list, send your e-mail to 
[email protected]

All emc-pstc postings are archived and searchable on the web at:
https://www.mail-archive.com/[email protected]/

Website:  https://ewh.ieee.org/soc/pses/
Instructions:  https://ewh.ieee.org/soc/pses/list.html (including how to 
unsubscribe)
List rules: 
https://pses.ieee.org/wp-content/uploads/2024/12/EM-PSTC-List-Rules.pdf

For help, send mail to the list administrators:
Mike Sherman at: [email protected]
Rick Linford at: [email protected]

For policy questions, send mail to:
Jim Bacher:  <[email protected]>
_________________________________________________
To unsubscribe from the EMC-PSTC list, click the following link: 
https://listserv.ieee.org/cgi-bin/wa?SUBED1=EMC-PSTC&A=1

Reply via email to