Chris Radek wrote. 

When you say Sherline a big red light comes on in my head.  There has
been a lot of talk lately about the timing parameters in stepconf.  If
your Z is slowly creeping down, I bet some timing is wrong.

An acceleration or velocity problem with Z moving up won't generally
lose a step or two, it will stall which means it comes to a stop and
you lose the entire remainder of the move.  Then it cuts WAY too
deep after that.

Hello Chris.
Yep, I started the Sherline stepconf (sorry about the big red light).
I think Heinz Reimer has looked at the timing parameters for the Sherline
mill and has given some timing values. 
I want to try and make sure I don't lose steps up or down.
However a slow feed rate does not mean a slow acceleration (John Kasunich).
So endeavoring to make sure I don't lose steps can I reduce the
acceleration, in the 'stepconf' as well as a slow feed rate. Basically will
a reduced acceleration minimize the risk of missed steps for a given
velocity (feed rate)?

Thanks Chris 
Dave
      


-------------------------------------------------------------------------
This SF.Net email is sponsored by the Moblin Your Move Developer's challenge
Build the coolest Linux based applications with Moblin SDK & win great prizes
Grand prize is a trip for two to an Open Source event anywhere in the world
http://moblin-contest.org/redirect.php?banner_id=100&url=/
_______________________________________________
Emc-users mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/emc-users

Reply via email to