Apologies for being a totally virgin new guy here to this group. (2 stupid 
questions...)

1) Can you help me help myself?  How can I search previous archives for 
specific 
questions? (I'd hate to interrupt the group to ask a dumb question that has 
already been asked..) 


I've tried different versions of google search   
"site:news.gmane.org/gmane.linux.distributions.emc.user search keywords" but 
the 
results there are of limited use.  Is there a better search system that I 
should 
be using?  (Note: I've not set up a newgroup controller with my internet 
service 
provider.. do I need to do that here?  Browser system is probably preferred, if 
that is possible.)

2) I'm designing the wire harness for a 2 dimensional CNC plasma cutter. (DC 
brushed motor, optical encoder, Rutex driver boards.)  I'm unclear on how to 
wire up the limit switches.  On our drive axis, we have a limit switch at one 
end, the other end the driver gears fall off the drive track.  I've got two 
switches, one for X axis, the other for Y axis which are normally closed to be 
used as limit switches on the appropriate end of the X,Y axis.  I'd like to 
send 
that signal into the system, but I'm not clear on where I get a +5v signal 
source.  Obviously I'd prefer to obtain a +5v reference directly from the 
parallel port.  I don't see a setup pull down that enables an output pin to 
always be set high (at least using the visual parallel port setup tool)  


Can I set an "Estop out" port to use as my +5V source to my limit switch, and 
return the "results" to a parallel port input pin (10, 11, 12, 13 or 15?)  
Obviously I'd have to add pull down/up resistor as appropriate to clean up the 
signal.  Anybody been here before?  (hmmm. or is that inverted Estop out to 
generate a +5v source when ever the machine is turned on?...)

Apologies if this question has been asked before.  I've spent a couple hours 
looking, and nothing pops up as far as I can see.  Many thanks for your 
assistance.

zip
i3detroit.org


      
------------------------------------------------------------------------------
Forrester Wave Report - Recovery time is now measured in hours and minutes
not days. Key insights are discussed in the 2010 Forrester Wave Report as
part of an in-depth evaluation of disaster recovery service providers.
Forrester found the best-in-class provider in terms of services and vision.
Read this report now!  http://p.sf.net/sfu/ibm-webcastpromo
_______________________________________________
Emc-users mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/emc-users

Reply via email to