Hi all,

1) Does someone know a way to move the management from one switch to another 
without having downtimes?

It seems that "set switch movemanagement" command will result in a downtime 
(1min or more) of all switches member of the stack(C5 or B5 stacks).

2) How to ensure that all Switches (C5) of the stack have the same config? I 
noticed that stacking a switch with a configured host IP-Address (mgmt) was not 
overwritten by the configuration of the "Master" switch. Once this second 
switch was designated as "Master" (due to powercycle of the first switch) the  
Host IP-Address was again in the config.

Regards,
Franco


---
To unsubscribe from enterasys, send email to [email protected] with the body: 
unsubscribe enterasys [email protected]

Reply via email to