Hello,
 
There will be a telecon on Friday, May 11 at 2:00 pm EDT (11:00 am PDT)
to discuss proposed changes to the Configuration & Change Management
Discipline.  The call is expected to last 1 hour.
 
Dial-in Number
US                 1-888-270-6089
International    1-702-759-8412
PIN                 786721#
 
These proposed changes are the result of a number of issues identified
in the last month or so with the current structure of the OpenUP/Basic
library as it relates to the C&CM discipline.  Relevant Bugzilla entries
are:
 
154065 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=154065>   09:13:45
nor     P3      PC      ASSI    EPF     Content         0.9     1.0 M8
CM - There is no configuration mgmt content in "Configura...    
176260 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=176260>   Tue
14:19   nor     P3      All     RESO    EPF     Content         0.9
1.0 M8  Dev - Disabling the CM package causes a reference error i...    
186142 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=186142>   11:03:46
nor     P3      All     ASSI    EPF     Content         0.9     1.0 M8
CM - Create task: Integrate and Create Build    
 
Closely associated are the following items:
 
176257 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=176257>   13:51:00
nor     P3      All     ASSI    EPF     Content         0.9     1.0 M8
Dev - Reconsider where the Build is created     
171112 <https://bugs.eclipse.org/bugs/show_bug.cgi?id=171112>
2007-05-02      nor     P3      All     ASSI    EPF     Content
0.9     1.0 M8  Dev - Incorporate concepts of Continuous Integration    
 
In summary, I propose we create a "configuration_management" package
within the collaboration package to capture the CM content, including
the new task.  The motivation for this change is the fact that
Configuration Management is a prime enabler of effective collaboration,
is a core capability for any software development effort, and it spans
multiple disciplines (as evidenced by 176260 and 176257).  Whether or
not we move the current Change Management content to this package is
still to be determined and will be part of the discussion.
 
Since the release date fast approaches and we do not want to make any
structural changes in M9, I would like to gain consensus on the way
forward so these changes can be implemented this month.  Please review
the above bugs prior to the meeting.
 
You may also find the screencam available at:
http://www.greenbeltpress.com/movies/crma37.html both amusing and
insightful.
 
Thanks,
Chris Sibbald 
--------------------------------------------------------------------------------
Telelogic Lifecycle Solutions:
Helping You Define, Design & Deliver Advanced Systems & Software
Learn More at www.telelogic.com

Chris Sibbald
Vice President, Standards and Technology
Telelogic North America Inc.
255 Albert Street, Suite 600
Ottawa Ontario K1P 6A9
Canada

Phone: +1 (613) 266 5061
Fax: +1 (613) 482 4538
Mobile phone: +1 (613) 266 5061


[EMAIL PROTECTED]
http://www.telelogic.com

 Telelogic - Requirements-Driven Innovation!
------------------------------------------------------------- 



The information contained in this e-mail, including any attachment or 
enclosure, is intended only for the person or entity to which it is addressed 
and may contain confidential material. Any unauthorized use, review, 
retransmissions, dissemination, copying or other use of this information by 
persons or entities other than the intended recipient is prohibited.
_______________________________________________
epf-dev mailing list
[email protected]
https://dev.eclipse.org/mailman/listinfo/epf-dev

Reply via email to