In preparation for next week's feedback fest (and because it's feature-freeze 
time) I've cut the rel_3_11 branch in the repository. Now we can work on fixing 
minor bugs to apply to both, and if a new feature finally makes it over the 
line next week it can go into master / main without delay.

One possible exception I'm hoping to make is for LP1902120; it's a feature that 
has been in high demand (though perhaps not by this method) for some time and 
is quite close. If all of the issues can be cleared up next week I'm willing to 
still let that in.

Note that the schedule has Beta 1 also being released today; I'm pushing that 
to the week after because it's possible during a feedback fest for that to be 
obsoleted very quickly.

Go forth and do good things.

Jason

-- 
Jason Boyer
Senior System Administrator
Equinox Open Library Initiative
[email protected]
+1 (877) Open-ILS (673-6457)
https://equinoxOLI.org/

_______________________________________________
Evergreen-dev mailing list
[email protected]
http://list.evergreen-ils.org/cgi-bin/mailman/listinfo/evergreen-dev

Reply via email to