Hi everyone! We have two days left in the Evergreen 3.12 Feedback Fest week, and a WHOLE LOT of bug fixes / proposed features that need testing!
Currently loaded on test servers and ready to test: - Accessibility: 2 (changes that need to be tested) - Acquisitions: 6 - Administration Pages: 2 - Cataloging: 9 - Circulation: 3 - Course Materials: 3 - OPAC: 2 In addition: - The Self-Check interface has been rewritten in Angular and needs to be thoroughly tested - The Enhanced Concerto Data Set is installed on one of the test servers - One server is set up to run in Czech to test internationaliation / translations The full list with details is at: https://docs.google.com/spreadsheets/d/1D4LiBJZzyeuczWCwYhG0VdaJ4UlK5CaTMKg4mO_hH2U/edit#gid=0 Let's see how much of this we can get tested and included in Evergreen 3.12! Thanks all, Terran Terran McCanna, PINES Program Manager ------------------------------ Georgia Public Library Service | University System of Georgia 2872 Woodcock Blvd, Suite 250 l Atlanta, GA 30341 (404) 235-7138 | tmcca...@georgialibraries.org http://help.georgialibraries.org | h...@georgialibraries.org <https://www.facebook.com/georgialibraries> <https://www.twitter.com/georgialibs> <https://www.instagram.com/georgialibraries/> <https://www.twitter.com/georgialibs> Join our email list <http://georgialibraries.org> for stories of Georgia libraries making an impact in our communities.
_______________________________________________ Evergreen-general mailing list Evergreen-general@list.evergreen-ils.org http://list.evergreen-ils.org/cgi-bin/mailman/listinfo/evergreen-general