Hi everyone!

We have two days left in the Evergreen 3.12 Feedback Fest week, and a WHOLE
LOT of bug fixes / proposed features that need testing!

Currently loaded on test servers and ready to test:

   - Accessibility: 2 (changes that need to be tested)
   - Acquisitions: 6
   - Administration Pages: 2
   - Cataloging: 9
   - Circulation: 3
   - Course Materials: 3
   - OPAC: 2

In addition:

   - The Self-Check interface has been rewritten in Angular and needs to be
   thoroughly tested
   - The Enhanced Concerto Data Set is installed on one of the test servers
   - One server is set up to run in Czech to test internationaliation /
   translations

The full list with details is at:
https://docs.google.com/spreadsheets/d/1D4LiBJZzyeuczWCwYhG0VdaJ4UlK5CaTMKg4mO_hH2U/edit#gid=0

Let's see how much of this we can get tested and included in Evergreen
3.12!

Thanks all,
Terran



Terran McCanna, PINES Program Manager
------------------------------

Georgia Public Library Service | University System of Georgia

2872 Woodcock Blvd, Suite 250 l Atlanta, GA 30341

(404) 235-7138 | tmcca...@georgialibraries.org

http://help.georgialibraries.org | h...@georgialibraries.org

<https://www.facebook.com/georgialibraries>
<https://www.twitter.com/georgialibs>
<https://www.instagram.com/georgialibraries/>
<https://www.twitter.com/georgialibs>

Join our email list <http://georgialibraries.org> for stories of Georgia
libraries making an impact in our communities.
_______________________________________________
Evergreen-general mailing list
Evergreen-general@list.evergreen-ils.org
http://list.evergreen-ils.org/cgi-bin/mailman/listinfo/evergreen-general

Reply via email to