OFED Nov 24, 2008 meeting minutes
===========================

Meeting Summary:
==============
*       OFED 1.4 release: RC6 on Nov 28, GA on Dec 8
*       UNH will test RC6 as part of Logo program (will start with RC5
this week)
*       OFED documentation and training - Jim Ryan will raise in next
XWG meeting


Details:
=======

> 1. Bugs status review:
> 1370          blo     [EMAIL PROTECTED]               Ping over IPoIB
> I/F fails after ifconfig down and up - there is a fix but its not
> integrated - Vlad to take it
> 1242  cri     [EMAIL PROTECTED]       kernel panic while
> running mpi2007 against ofed1.4 -- ib_... - should be delayed for
> 1.4.1 - move to normal
> 1410          cri     [EMAIL PROTECTED]               Memory leak
> (address handler not reped) in IPoIB - we have a fix, need to decide
> 1289  maj     [EMAIL PROTECTED]               Ib and ipoib doesn't
> respond while running multiple tests ... - should be fixed - ask
> Mellanox QA to check
> 1407  maj     [EMAIL PROTECTED]               Active-Backup failure
> when disabling an active slave inte... - fixed with new bonding
> package
> 1377  maj     [EMAIL PROTECTED]               Deadlock occurred during
> HA test - on work
> 1380  maj     [EMAIL PROTECTED]               Cannot unload ib_srpt
> module on SRP target - moved to normal (involves scst's mid-layer
> module which we don't have *a lot of* control)
> 1395  maj     [EMAIL PROTECTED]               kernel panic during SRP
> HA test - on work
> 1384          maj     [EMAIL PROTECTED]               netperf latency
> small messages increase 5% - not reproduced on SLES10 SP2 with FW
> 2.5.0
> 1385  maj     [EMAIL PROTECTED]               ofed 1.4 - netperf udp
> BW small messages decrease ~8%
> 1386  maj     [EMAIL PROTECTED]               ofed 1.4 - iperf tcp
> connected mode BW large messages dec...
> 
mvapich2 - Going to update package + RN

> 2. Decided on release date:
*       RC6 - 28 for Nov
*       GA - Dec 8 after UNH testing for the logo program

> 3. Decided on next meetings dates:
>     Dec 1, Dec 8 and Dec 15 (only if the release is not done)
> 
4. Logo program and OFED release:
*       We wish that UNH will test it on each RC, as each vendor does,
so we will not find surprises in the last RC.
*       Rupert will see if they can start with RC5 this week.
*       UNH will test RC6 next week
*       Need to add Windows - Linux interop to the Logo program - Rupert
will lead the change to the test plan. Should be done in next interop
event.

5. Training and documentation:
*       In OFA BOF there was a request for documentation and training
for using OFED.
*       Jim Ryan will raise the subject of training/documents in the XWG
meeting, and see if OFA can finance it
*       Options - some company in the bay area (I did not captured the
name) and UNH on east cost
*       Olga to check with Voltaire if they have something to contribute
*       Tziporet will check with Mellanox to see if we can contribute
our verbs user manual


> Tziporet