One of the last things that I need to do in my Ex5.5 site before removing the last server and going native is to redo the "routing". Now, I have an E2k setup with 2 Front-ends and 2 back-end servers. On my last 5.5 server I need to have one of these servers take over the routing. Should I have one of the front-end servers be designated as the routing server? Or does removing the ex5.5 force the routing tables to be rebuilt with the 1st ex2000 server being assigned as the routing server?
Ron _________________________________________________________________ List posting FAQ: http://www.swinc.com/resource/exch_faq.htm Archives: http://www.swynk.com/sitesearch/search.asp To unsubscribe: mailto:[EMAIL PROTECTED] Exchange List admin: [EMAIL PROTECTED]