One of the last things that I need to do in my Ex5.5 site before removing
the last server and going native is
to redo the "routing".  Now, I have an E2k setup with 2 Front-ends and 2
back-end servers.  On my last 5.5 server I need to have one of these servers
take over the routing.  Should I have one of the front-end
servers be designated as the routing server?  Or does removing the ex5.5
force the routing tables to be rebuilt with the 1st ex2000 server being
assigned as the routing server?

Ron

_________________________________________________________________
List posting FAQ:       http://www.swinc.com/resource/exch_faq.htm
Archives:               http://www.swynk.com/sitesearch/search.asp
To unsubscribe:         mailto:[EMAIL PROTECTED]
Exchange List admin:    [EMAIL PROTECTED]

Reply via email to