Thank you!

I'm afraid in that case I will end up with 15 or so maven projects to
build my app for 15 different graphic sets were the only difference
would be in which branding dependency (swc file with graphics only) to
add. Do you think maven build process is a bad choice for my case?

On Jan 15, 6:09 pm, Marvin Froeder <[email protected]> wrote:
> If you wanna produce 2 artifacts is really advised to have 2 projects.  Now,
> if you wanna 2 artifacts with two different dependencies set, then it is a
> must.  Maven doesn't allow to build same stuff twice, using different
> dependencies on the same reactor.
>
> VELO

-- 
You received this message because you are subscribed to the Google
Groups "Flex Mojos" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to
[email protected]
For more options, visit this group at
http://groups.google.com/group/flex-mojos

http://flexmojos.sonatype.org/

Reply via email to