Hi All,
Can someone point me to where I can find information on trace width and
trace to trace spacing to comply with UL and CE requirements. I have 3
phases and neutral I need to route (120VAC/2A or 220VAC/1A). I've been told
the requirements are different for phase to phase vs phase to neutral trace
spacing. Thanks for the help.

Jeff Jolie
[EMAIL PROTECTED]
New England Automated
Machine Engineering, Inc.
http://www.neame.com
860-526-3968
860-526-4108 fax

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
* To post a message: mailto:[EMAIL PROTECTED]
*
* To leave this list visit:
* http://www.techservinc.com/protelusers/leave.html
*                      - or email -
* mailto:[EMAIL PROTECTED]?body=leave%20proteledaforum
*
* Contact the list manager:
* mailto:[EMAIL PROTECTED]
*
* Browse or Search previous postings:
* http://www.mail-archive.com/[email protected]
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Reply via email to