Does anybody have a step-by-step procedure (with common problems and tweaks) to 
upgrade FP2 to FP3 on IPSO. So basically I have to upgrade the IPSO also 
simultaneously to 3.6. What I am looking for is the right way to do it. I mean can I 
go to 3.6 straight away? Similarly how about FP2 to FP3.

Thaks for your Help

Andres Zorrilla

=================================================
To set vacation, Out-Of-Office, or away messages,
send an email to [EMAIL PROTECTED]
in the BODY of the email add:
set fw-1-mailinglist nomail
=================================================
To unsubscribe from this mailing list,
please see the instructions at
http://www.checkpoint.com/services/mailing.html
=================================================
If you have any questions on how to change your
subscription options, email
[EMAIL PROTECTED]
=================================================

Reply via email to