Hi guys, I just upgraded to R60 HFA_03 and I have the following error, does NGX use much more resources that the connection table gets smaller? Before the upgrade everything worked ok. How can I decide how much I can increase the connection table?? [LOG_CRIT] kernel: FW-1: WARNING: The connections table is 80% full. [LOG_CRIT] kernel: New connections will be dropped once the connection table reaches [LOG_CRIT] kernel: full capacity. Please consider increasing the connections table limit. [LOG_CRIT] kernel: Best regards, Lino
================================================= To set vacation, Out-Of-Office, or away messages, send an email to [EMAIL PROTECTED] in the BODY of the email add: set fw-1-mailinglist nomail ================================================= To unsubscribe from this mailing list, please see the instructions at http://www.checkpoint.com/services/mailing.html ================================================= If you have any questions on how to change your subscription options, email [EMAIL PROTECTED] =================================================
