Status: Accepted
Owner: [email protected]
CC: [email protected]
Labels: Priority-High Milestone-Release2.11
New issue 723 by [email protected]: The sporadic failures of gnt-job cancel
http://code.google.com/p/ganeti/issues/detail?id=723
What steps will reproduce the problem?
1. Run the job-cancellation QA test many times.
2. Encounter a run where the job remains in the canceling status for 40 or
so seconds, breaking the test.
3. Cry.
What is the expected output? What do you see instead?
The job should have dropped the canceling status and became canceled within
the 40 seconds.
This has not manifested itself in versions lower than 2.11, but this does
not mean the bug is not there, as 2.11 and above receive far more QA runs
than others.
--
You received this message because this project is configured to send all
issue notifications to this address.
You may adjust your notification preferences at:
https://code.google.com/hosting/settings