All -

I've just pushed the code changes enabling multiple propagators in hte navigation subsystem (aka TdrsProp).  You'll see test case failures related to TDRS based measurements in the nightly test runs until we get the test cases cleaned up.  These failures run from a fix in the feasibility check for spacecraft-to-spacecraft signals. Earth can get in the way now; the Earth obstruction check was turned off until now.

This message is just a heads-up.  Expect the pass rates to plummet from the current 99.94% to a more dismal number. (Last full test run I made - last Friday - had us at 99.63% on the TdrsProp branch, but there have been fixes for some of the tests since then.)

- DJC

--
Darrel J. Conway, Ph.D.      Thinking Systems, Inc.
Senior Scientist and CEO     437 W Thurber Road, Suite 6
Phone: (623) 298-4530        Tucson, AZ 85705
FAX:   (520) 232-2533        www.thinksysinc.com
Cell:  (520) 425-3626        [email protected]



_______________________________________________
Gmat-buildtest mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/gmat-buildtest
  • [Gmat-build... Darrel Conway
    • Re: [G... Slojkowski, Steven E. (GSFC-595.0)[OMITRON] via Gmat-buildtest

Reply via email to