All -
I've just pushed the code changes enabling multiple propagators in hte
navigation subsystem (aka TdrsProp). You'll see test case failures
related to TDRS based measurements in the nightly test runs until we get
the test cases cleaned up. These failures run from a fix in the
feasibility check for spacecraft-to-spacecraft signals. Earth can get in
the way now; the Earth obstruction check was turned off until now.
This message is just a heads-up. Expect the pass rates to plummet from
the current 99.94% to a more dismal number. (Last full test run I made -
last Friday - had us at 99.63% on the TdrsProp branch, but there have
been fixes for some of the tests since then.)
- DJC
--
Darrel J. Conway, Ph.D. Thinking Systems, Inc.
Senior Scientist and CEO 437 W Thurber Road, Suite 6
Phone: (623) 298-4530 Tucson, AZ 85705
FAX: (520) 232-2533 www.thinksysinc.com
Cell: (520) 425-3626 [email protected]
_______________________________________________
Gmat-buildtest mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/gmat-buildtest