Hello Yang, Hello Yang,
GoCD keeps track time for the following events - Scheduled - Time when a job is scheduled(this is when a pipeline is triggered manually or because of change in the material) Assigned - Time when a job is assigned to an agent Preparing - Time when the agent starts checking out material Building - Time when the first job is started executing the first task Completing - Time when task execution is finished. Artifact upload is happening Completed - Time when an agent has done building job and ready for the new job So to answer your question WaitTime = (Assigned - Scheduled). Bhupendrakumar Piprava Sr.Consultant Email [email protected] Telephone +91 7276373725 <+91+7276373725> [image: ThoughtWorks] <http://www.thoughtworks.com/?utm_campaign=bhupendrakumar-piprava-signature&utm_medium=email&utm_source=thoughtworks-email-signature-generator> On Wed, Jan 2, 2019 at 2:36 PM Yang Zhang <[email protected]> wrote: > Dear all, do you know the meaning of Wait Time in GoCD Analytics Plugin? > Thanks in advance. > > > [image: Pipeline_Build_Time.png] > > -- > You received this message because you are subscribed to the Google Groups > "go-cd" group. > To unsubscribe from this group and stop receiving emails from it, send an > email to [email protected]. > For more options, visit https://groups.google.com/d/optout. > -- You received this message because you are subscribed to the Google Groups "go-cd" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. For more options, visit https://groups.google.com/d/optout.
