To,                                                                             
              27.8.2016
Shri Ajoy Mehta,
Municipal Commisioner,
BMC Head Office, Room No. 46,  Old Bldg., 1st Floor,
Mahapalika Marg,  Mumbai – 400001.


Dear Mr Ajoy Mehta,

At the outset I wish to state that my submissions below are with due respect 
and all humility, with no intention to cause hurt and injury to any individual 
and /or institution, but only in the interest of public at large. In the event, 
if my submissions are incorrect, I shall be obliged if your office can educate 
me by furnishing relevant documents in support. Without prejudice to my rights 
and contentions I submit as under.


Subject :--

Your following improper conduct, brought to your notice by activist – Mr 
Kamlakar Shenoy (Cell No. 9870987359, E-mail :  
shenoykr2...@yahoo.co.in<mailto:shenoykr2...@yahoo.co.in>), which holds the 
Mumbai citizens to ransom :--

a.    Turning a blind eye to illegal construction, (in almost whole of Mumbai)

b.   Turning a blind eye to sub standard roads which endangers life and limbs 
of citizens. (almost whole of Mumbai).

c.    Awarding roads and bridges contract to tainted contractors even after 
having knowledge of sub standard work carried out by tainted contractors. ( 
Hon. High Court cancels a contract too).

d.   Inaction against encroachment on roads and footpath by erecting shops 
making the roads and footpaths impassable and endangering life and limbs of the 
citizens. (e.g JJ hospital to Akbar Peerbhoy college, Crowford market to Bhendi 
bazar, Bhendibazar to Char null, Y.M. road and many others in Mumbai)

e.    Deficiency of service, permitting illegal occupation of premises without 
valid occupation certificate.

f.     Permitting illegal construction in Dongri, Pydhonie,  Bhendi bazaar 
(Mumbai 400004, 400008, 400009 ) and no remedial action against such illegal 
constructions and BMC officers.

g.    Aiding the illegal buildings constructed on the plots reserved for public 
amenities. e.g Plot no. 746, Stanley Fernandes Wadi, Near Catering College , 
Prabhadevi, Mumbai-25. (Copy attached no. 1)

h.   Shielding the Ex Municipal Commissioner and officers of BMC who illegally

i.     Reduced the Play Ground space from 2006 to 1283 Sq.mtrs without 
authority at Dasturwadi, Dadar E.

ii.   Issued occupation certificate without Play Ground and Recreation ground 
as per sanctioned plan

iii. Issued occupation certificate when the construction carried out in not in 
accordance with sanction Plan. (Copy attached no. 2)

i.     Spending of tax money to pay lawyers / Sr. Counsels’ fees and shield the 
BMC officers against whom FIRs are registered for committing offences which 
have no connection with discharge of official duty.

j.     Many other illegal acts brought to your notice by activist – Mr Kamlakar 
Shenoy.


Reference : --


a.    Your statement in Mumbai Mirror dt. 8.8.16 that BMC will not allow 
housing industry to be held to ransom. Avoiding meeting citizens and denying to 
provide the visitors book disclosing how many ordinary citizens are given 
appointment.

b.   Meeting tainted developers by making them sit in VIP lounge on 4.7.2016.

c.    Denying the request to get the queries raised by whole of Building 
Proposal Dept, (City) from Sr. Counsel  and UD Department.


Please wake up Mr Ajoy Mehta :--

In the larger interest of citizens you need to justify your following acts done 
as Municipal Commissioner of Mumbai  :--


1.   Your statement to Mumbai Mirror newspaper : “BMC will not allow housing 
industry to be held to ransom.” However, you have :--



a.    …. not denied nor gave any clarifications on the issues raised by me and 
building proposal department about the illegal opinion given by legal department

b.   ….. not clarified illegal sanction of building without compliance of 
section 39  and 92 of MRTP act, which deprives the citizens of basic amenities 
such as Municipal theatre.



2.   Please give your clarification as to why you have held the ordinary 
citizens to ransom on the issues raised herein above. What action have you 
taken to remove the above illegalities which hold a ordinary citizen to ransom.



3.   I say that you should also clarify whether your office works for rich and 
powerful society or for common man at large. If so why have you not provided 
list of visitors you have met since you took as MC.



4.   You shall clarify whether you Mr. Ajoy Mehta can hold to ransom all the 
citizens of Mumbai who pay you salary and extra ordinary perks by being a 
silent spectator with dishonest intentions to shield the following :--



a.    ….  the developers who loot the common man

i.             by charging 80 % loading on carpet area.

ii.           By illegally charging on floor rise.

iii.          By illegally charging heavily to parking space free of FSI

iv.          By illegally converting the parking space into residential and 
commercial premises

v.            By delaying possession of flats for 5 to 10 years even after 
receiving 95% of the consideration.

vi.          By illegally parting possession of flats without valid occupation 
certificates.

vii.         By grabbing the plots reserved for public amenities.

viii.       By committing FSI violations by constructing illegal floors.

ix.          By collecting development charges/ infrastructure charges/ club 
charges

x.            By depriving the citizens of Play Ground and recreation grounds.



b.   …..  the encroachers on roads and footpath endangering life and limbs of 
citizens.


i.             By permitting shops and illegal commercial premises on whole of 
footpath and many other roads.

ii.           Constructing gardens on footpath and depriving the pedestrians of 
safe walk

iii.          By constructing island on roads to facilitate politicians to hang 
their photos in spite of the roads being jammed due to heavy traffic.

iv.          Permitting politicians to construct newspaper library on roads and 
footpath. B ward in particular.

v.



c.    … tolerate sub-standard standards roads and footpaths



i.             Tar roads having life of 5 years are out of shape in 3 to 9 
months and in the 1st rainy season.

ii.           Concrete road having 30 years of life give up cracks, there is no 
water table, no meridians, no smooth surface, and water logging on new roads. 
The cracks appear on concrete roads within 1 year. ( please the work of Shivdas 
Chapsey concrete road constructed in the year 1992)

iii.         Water logging on the sides of road and divider splashing the 
waters on the car wind screen thereby endangering life and limbs of citizens

iv.         Man holes and utility chambers going deep in or coming high above 
thereby endangering life and limb of the citizens.

v.            Footpaths paver blocks giving way with 3 months of installing, 
inspite of the life being 5 years

vi.          Pot holes filled are back to original by just one rain fall.

vii.         The roads and footpath reconstructed and repaired is not inspected 
and certified stating that the construction is carried out as per specifications


d.   … tolerate sub-standard Byculla Lalbaug bridge and eastern freeway


i.             There is no life span mentioned in the contract.

ii.           For bridges with life span of 100 years the BMC only has 5 years 
Defect Liability period. What a unfortunate application of mind.

iii.          The concrete roads on the Eastern freeway having life of 30 years 
have been wading off within 3 months of the inauguration of roads.

iv.          There is no inspection report and documents which confirm that the 
work is carried out as per specifications.



e.    … not acting against those officers who have caused losses of hundreds of 
Crores of Rupees and also against whom 250 cases are registered by BMC.



5.   …. failed to reply to any of my letters on the grounds that these letters 
are not on record when in fact these letters have been sent by mail to your 
office.   ( copy attached)



6.   …. clarify why Road / bridges contracts were awarded to tainted 
contractors (refer my letter dt. 15.7.16 addressed to you and sent by mail) 
Attached No. 7)



7.   … delay to register FIR and black list the tainted road contractors from 
3.12.15 to 16.5.16.



8.   I say that the chart submitted by the Chief Engineer in his submission 
(which discloses at page 113 top on right side) clearly discloses the knowledge 
of the BMC Municipal Commissioner and all other senior officials of roads and 
bridges about the sub standard work and materials used in the construction and 
repairs of the roads, and their intentions to black list such contractors. The 
said observations are made from the following date sequence as stated by BMC in 
their reply


a.    16.10.2015: direction to examine the details of complaints by Poonam 
Mahajan ( M.P.). (pg 104 para 7)

b.   3.12.15: MC order dt. 3.12.2015 clause 2 directs the process of 
blacklisting of contractors and registration of FIR.(page 108 para 1)

c.    10.12.15: notice and communication to contractors. (Pg 108, line 1)

d.   24.02.15: report filed by two member committee. page (104 para 7)

e.    1.4.2016: Addl. Municipal Commissioner submits detailed report (Pg 104 
para 8)

f.     18.04.16: Municipal Commissioner directs Addl. Municipal Commissioner to 
submit report for action taken. (Para 9)

g.    20.04.16: Addl. Municipal Commissioner submits detailed report.(para 10)

h.   25.04.16: Municipal Commissioner issues detailed order on report dt. 
20.4.16 of Addl. MC. (para 10)

i.     27.04.16: FIR registered against contractors and third party Quality 
auditors at Azad Maidan. (para 10)

j.     16.05.16:  Faulty show cause notice issued to contractors. (Para 11)

k.   Chief Engineer submission (attached no. 8)

You were seized with knowledge about the substandard work of the tainted 
contractors, before granting of 4 road contracts to these tainted contractors.


9.   You and the officers of BMC were aware of the sub standard work by the 
contractors and that these contractors would be black listed

a.      when DL to M.S. signed in favour of the accused tainted contractors on 
4.05.16

b.      Standing Committee Resolution was passed on 4.05.16 in favour of the 
accused tainted contractor.


Willful delay to register FIR and issue show cause notice since 3.12.2015 by 
your Office


10.                I say that it is pertinent to note that

a.    The Municipal Commissioner directs on 3.12.2015 to start the process of 
black listing the contractors. He has also directed to register FIR. However, 
no FIR was registered for reasons best known to Municipal Commissioner, nor is 
there any document disclosing Municipal commissioner has taken any action 
against any BMC officer for disobeying the direction to register FIR.

Deliberate act of Municipal Commissioner to black list the Road contractors 
without serving show cause notice.


11.                The direction to start process of black listing against the 
six road contractors were given by Municipal Commissioner, without giving any 
opportunity to the accused tainted contractors, with dishonest intentions, to 
provide these accused tainted contractors an opportunity to move the Court and 
get stay on his order passed on 3.12.2015 and thereby further delay the actual 
process of black listing of tainted road contractors. By such delay the accused 
contractors could make themselves eligible to get the contracts of the four 
projects, (which has been now cancelled by the Hon. Bombay High Court ) on 
technical grounds that as on the day of the awarding the contract there was 
nothing adverse on record against the tainted contractors.



12.                The intention of Municipal Commissioner, not directing 
issuance of show cause notice before passing a order to black list the accused 
tainted contractors is because that if the show cause notice was issued in 
accordance with law, in that event, the process of declaring these contractors’ 
as black listed would have been completed immediately prior to the 4 contracts 
being awarded in April / May 2016 and this would have prevented the Municipal 
commissioner from awarding these contracts to these contractors as these 
tainted contractors would have been debarred from participating in tender 
process.



13.                It is pertinent to note that when there is mass scale 
corruption and sub standard work done why Municipal Commissioner failed to 
direct the inspection of all the roads and restricted to only 15%. This act of 
the Municipal Commissioner should be investigated as it prima facie discloses 
dishonest intentions.



14.               Inaction to register FIR and issue show cause notice for two 
months between 24.2.2016 and 25.4.16, the File was just moving between the 
office of Municipal Commissioner and Addl Municipal Commissioner.



I say that there are sufficient grounds for Municipal commissioner to again 
direct registration of FIR and issuance of show cause notice, but was not done 
i.e.



a.    After the direction of preliminary enquiry on 16.10.15 and the report 
filed by two members committee on 24.2.16, show cause notice should have been 
immediately issued.

b.   Since 24.2.16 to 1.4.16 it took 35 days for Addl Municipal Commissioner to 
file report on the findings and submission made by the two member committee, 
i.e. on 1.4.16. Surprisingly, the report submitted by Addl. Commissioner after 
lapse of 35 days, did not mention what action is to be taken against the 
contractors. In such sensitive cases, the inaction on the part of Municipal 
Commissioner is a serious lapse.

c.    As the Addl Municipal Commissioner did not submit on 1.4.16, what action 
is to be taken, the Municipal commissioner could not decide what action is 
required to be taken for 18 days. And sent back the file to Addl. MC on 
18.4.16. It took 18 days for Municipal Commissioner to return the file to Addl 
MC requesting what action is required to be taken. It is pertinent to note that 
on 3.12.2015 Municipal Commissioner has directed black listing of contractors 
and registration of FIR, but was unable to take a decision thereafter.



d.   On 20.4.16 Addl MC submits report to Municipal Commissioner of action to 
be taken.

e.    On 22.4.16 the noting of DL to MC is submitted wherein it is stated at 
annexure A para 3 ( C) that



“ contractor has carried out work satisfactorily.”


Ajoy Mehta Municipal Commissioner signs and makes a false observation in favor 
of tainted contractors.  (Attached copy of the DL to MS no.8)


f.     However, at the time of signing the DL to MS on 22.4.16 the Municipal 
Commissioner had knowledge of

i.              his directions against these 6 tainted contractors since 
3.12.15 to black list the contractors and to file FIR

ii.           The report of the two member committee against the tainted 
contractors.

iii.         The earlier report submitted by the Addl. Municipal Commissioner 
against the tainted contractors.

iv.         The report sent by Addl. MC on 20.4.2016 i.e. just two days before.



g.    25.4.16 MC directs registration of FIR. However fails to direct to issue 
show cause notice for black listing the contractors and third party auditors.

h.   Fails to direct cancellation of contracts awarded to tainted contractors.

i.     On 27.4.2016 FIR registered at Azad Maidan police station.
Sir, I humbly submit you to justify the above inactions and that all these acts 
were done in the interest of public at large.  The documents referred to in the 
above letter are uploaded on this link for your easy reference :  
https://app.box.com/s/k5iog0xonc527sv8mdluujj9bludt8hp



Thanking you.


Yours truly,




G R Vora