Hi, Daniel and All.

Some advice here: I am using the calendar with the frozen version in a page 
that already has a sankey chart with the last version in production (1.0). 
I am facing some difficulties to keep both working. I tried to build a 
fiddle without success at the moment, and just arrived here to ask if there 
is some kind of conflict to use both the production and frozen version in 
the same page. Thanks.

-- 
You received this message because you are subscribed to the Google Groups 
"Google Visualization API" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at https://groups.google.com/group/google-visualization-api.
To view this discussion on the web visit 
https://groups.google.com/d/msgid/google-visualization-api/59ccbe6a-f3e8-4ffd-a7d4-0346482b0a93%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

Reply via email to