I'm trying to do a graph in a gantt style, and I've got something working pretty much. However, the bar lengths are measured in minutes rather than days.
-- You received this message because you are subscribed to the Google Groups "Google Visualization API" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To post to this group, send email to [email protected]. Visit this group at https://groups.google.com/group/google-visualization-api. To view this discussion on the web visit https://groups.google.com/d/msgid/google-visualization-api/f6b2c60e-fc7d-45b1-a4df-6a3798839fc7%40googlegroups.com. For more options, visit https://groups.google.com/d/optout.
