I am using Google Charts Gantt option for one of my requirement, while usage I am facing some issues which are as following: a) The date line is coming at the bottom can it be some how placed at the top of the Gantt Chart. It is because, as date line is at the bottom if the list grown it doesn't visible, one need to scroll down to look at it. b) Is it possible to fix the date line at bottom or top and the Gantt portion keeps scrolling with in that c) If the task description is long the part of the task description dose not appear, it is possible to wrap the text to next line
Can any one kindly help with some solution to this.... -- You received this message because you are subscribed to the Google Groups "Google Visualization API" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To post to this group, send email to [email protected]. Visit this group at https://groups.google.com/group/google-visualization-api. To view this discussion on the web visit https://groups.google.com/d/msgid/google-visualization-api/51327988-8487-446d-89bb-890c5c9aacaf%40googlegroups.com. For more options, visit https://groups.google.com/d/optout.
