Rewriting Geography, BJP Style

The BJP’s election manifesto 2014 promises “inter-linking
of rivers based on feasibility” to pander to those regional parties
which have already exhausted the local water resources in their
respective states. To drive home the message, the BJP’s prime
ministerial candidate says, “In Gujarat, we have inter-linked 20
rivers and the agriculture growth is 10 per cent.” Its manifesto for
the Lok Sabha elections in 2009 had promised, “massive public sector
investments in job-generating infrastructure programmes, especially
building of roads and highways, and linking of rivers”.

In NDA’s ‘Agenda for Development, Good Governance and Peace: Lok Sabha
2004’ it had promised, “The river-linking project will be launched
before August 15, 2004. An initial set of identified schemes will be
implemented with public participation by 2015. An effective
rehabilitation package for the project-affected persons shall be
finalized and implemented.” An earlier BJP-NDA ‘Agenda for a proud,
prosperous India: Lok Sabha 1999” had stated, “We will examine and
take time-bound steps to link Ganga-Cauvery rivers.”

In September 1999, Prof SR Hashim, who was heading the Government’s
National Commission for Water Resource Development (NCWRD), submitted
the Integrated Water Resource Development Plan. This plan stated that
“the Himalayan river-linking data is not freely available but on the
basis of public information it appears that the Himalayan
river-linking component is not feasible for the period of review up to
2050″.

APJ Abdul Kalam, the then president, in his Independence Day speech on
August 14, 2002, affirmed, “It is paradoxical to see floods in one
part of our country while some other parts face drought. This
drought-flood phenomenon is a recurring feature. The need of the hour
is to have a water mission which will enable availability of water to
the fields, villages, towns and industries throughout the year, even
while maintaining environmental purity. One major part of the water
mission would be networking of our rivers. Technological and project
management capabilities of our country can rise to the occasion and
make this river networking a reality with long term planning and
proper investment.” Had he sought existing wisdom within the
government regarding networking or river-linking of rivers, he would
have learnt that after rigorous examination the NCWRD had examined and
rejected the idea. The Kalam speech was either echoing the BJP’s
manifesto of 1999 where the linking of Ganga-Cauvery rivers had been
mentioned, or, merely giving expression to his own fancies without any
scientific basis.

The linking of rivers came into the picture in 1972 when the
Ganga-Cauvery link proposal mooted by KL Rao, former union irrigation
minister, was examined and dumped by the Union Ministry of Water
Resources after the Central Water Commission found it to be “grossly
under-estimated”. Prior to this, Captain Dastur had proposed a
‘garland of canals’ connecting the Himalayan rivers and the peninsular
rivers; this was found “technically unsound and economically
prohibitive”. Despite these rejections, some unknown lobbies kept
pursuing it and planting it in the minds of key functionaries of the
Government of India.
Notably, Mukesh Ambani, Chairman, Reliance Industries Limited, had
also said that “a convergence of civil engineering and agriculture can
build a trans-India water resources system by linking rivers.”

The ‘networking of rivers’ does not mean drawing some mega litres from
one river and pouring it into another, like one does with containers
(or even with canals). The ramifications are much wider because a
river is not only the water that flows or the channel which holds the
flow. A river is the dynamic face of the landscape. In the drama of
history, the eco system is not a stage — it is the cast.

Kalam claimed that inter-linking of rivers will provide 300 billion
cubic metres (BCM) of additional water. However, the National Water
Development Agency (NWDA) provided a different figure of 174 BCM. It
has been estimated that canals involved in this project will cause the
submergence of 625, 000 hectares of land while reservoirs will lead to
the submergence of 1,050,000 hectares, leading to the displacement of
about 3.l4 million people. He has repeatedly observed that floods
affect eight major water basins, 40 million hectares and 260 million
people.

However, the ‘surplus’ water being diverted through inter-linking
ranges between 2 and 2.5 per cent of peak flood discharge of surplus
rivers like the Ganga, Brahmaputra and Mahanadi. This is corroborated
by the Central Water Commission, NWDA, and authors of the National
Commission for Integrated Water Resources Development Plan.
The Supreme Court judgment on the basis of an application moved by an
amicus curie who put the speech of Kalam before the court has put the
focus back on the Interlinking of Rivers (ILR). If implemented, it
will be the world’s biggest infrastructure project and will alter the
nation’s geography for all times to come. Indeed, does it make
ecological sense?

The project proponents ask, ‘What is the cost of not taking up the
project?’ Their argument implies that if it is not taken up it would
mean an opportunity lost.

However, they fail to answer several relevant questions with regard to
“costs” posed by the South Asia Network of Dams, Rivers & People
(SANDRP): What is the cost of neglecting rainwater harvesting
potential in the river basins of India, including groundwater
recharging? What is the cost of not assessing and realising the
benefits of watershed development in any of the river basins? What is
the cost of not maintaining and rejuvenating the existing local water
systems? What is the cost of not arresting siltation in existing
reservoirs which are filling up at much higher rates than the design
assumptions? What is the cost of not getting optimum results from the
existing irrigation infrastructure in India, the largest in the world?
What is the cost of maintaining drainage systems in agricultural
areas? What is the cost of not arresting the pollution of India’s
freshwater systems? What is the cost of not assessing the demand-side
management options in water and energy systems? What is the cost of
not arresting the transmission and distribution losses from our water
and energy supply systems, stopping thefts, and making the elite pay
for the services they use? What is the cost of not stopping the
‘hidden export’ of water with huge subsidies that India is indulging
in, vis-à-vis sugar and food grains export? What is the cost of not
managing peak power demands, not charging higher tariff during peak
periods and not using the existing hydro capacities for peak power
supply? And, finally, what is the cost of not allowing adequate
freshwater flows in the dammed rivers downstream?

The proponents obstinately pursuing the ILR project, in their bid to
outwit the resistance to such projects, have a Plan A and Plan B. The
State’s proposals are part of Plan B. Plan A is the national
interlinking of rivers. The ILR programme is estimated at an
aggregated cost of a gigantic Rs 1,25,342 crore in terms of 2002-3
prices. It is aimed to create additional storage facilities and
transfer water from water-surplus regions to more drought-prone areas
through inter-basin transfers. It is claimed that it will provide
additional irrigation in about 30 million hectares and net power
generation capacity of about 20,000 to 25,000 MW.

While the NWDA claims that Ganga, Kosi and Gandak rivers have surplus
water, the Bihar government has refuted the claim. Similar
reservations have been voiced by other states. Jairam Ramesh had
submitted in Parliament in 2005: “…in my view, there would be no
greater calamity than massive inter-linking of rivers.” However, after
the Supreme Court’s verdict and BJP’s support of ILR in its current
manifesto, Ramesh and the Congress leadership chose to maintain a
collusive silence. The Congress-led central government, the BJP-led
Gujarat and MP government, and the Samajwadi Party-led UP government
have signed MoUs to undertake the ILR project. Even the JD(U)-led
Bihar government is keen to undertake ILR projects. States like
Kerala, Punjab, West Bengal and Maharashtra had earlier rejected the
ILR project of Plan A; but they have got trapped by the state-specific
Plan B. The NWDA has proposed 30 major river link canals involving 37
rivers throughout the country to transfer water from so-called surplus
basins to water-deficit basins as part of the peninsular and Himalayan
components of the ILR project.

Notably, Bangladesh, as a downstream country, will be directly
affected. The apex court judgment acknowledges that the construction
of storage reservoirs on the principal tributaries of the Ganga and
Brahmaputra rivers in India, Bhutan and Nepal makes this an
international issue. Bangladesh is also an affected party, but it does
not find mention in the judgment.

Ironically, Justice Swatanter Kumar, who authored the judgment to
undertake the world’s most ecologically disastrous project, is
currently the chairman of the National Green Tribunal, whose mandate
is to prevent environmental damage.

A study conducted by the National Council for Applied Economic
Research (NCAER) cites A Vaidyanathan’s 2001 paper titled ‘Irrigation
Subsidies’ and the ‘Report of the Committee on Pricing of Irrigation
Water’ (1992) drafted for the Planning Commission under his
chairmanship. Ironically, his views debunking the myth of ‘surplus’
rivers are deliberately ignored. Indeed, the judgment also did not
take note that as per NCAER the new aggregated cost is Rs 1,25,343
crore or 22.4 per cent lower than the earlier aggregate estimate of Rs
5,60,000 crore, at 2002-03 prices.

In the past, the court has rightly and consistently held that large
infrastructure projects invariably raise technical and policy issues
which the courts are not equipped to handle. In view of the reasons
cited above and especially an evolving international law on
transboundary rivers, here is a clear case for the apex court to
review its order on “networking of rivers.”
In any case, the critical issue is how to solve India’s water problem.
As per the Planning Commission’s Tenth Plan document, there are 383
ongoing major and medium projects awaiting completion, 111 of which
are pending for more than 26 years. All these projects can be
completed within five to eight years yielding an additional potential
of about 14 million hectares at a cost of Rs 100,000 crore, as
estimated by the Tenth Plan task force.

The second component listed in the Plan is the development of minor
irrigation, mostly in the eastern and northeastern regions. The total
potential assessed is 24.5 million hectares with a total investment of
Rs 54,000 crore of which the government is expected to provide only Rs
13,500 crore, the balance coming from beneficiary farmers and
institutional loans. The cost per hectare is only Rs 20,000 and
gestation period almost nil, against a cost of Rs 100,000 and a
12-year gestation period for major and medium projects.

The third, equally beneficial scheme mentioned in the Plan is the
groundwater recharge master plan prepared by the Central Ground Water
Board, needing Rs 24,500 crore to trap 36 billion cubic metres of
water annually. These measures are clearly better than the networking
of rivers. In this context, the judgment seems akin to what the
science journal, New Scientist, referred to as “replumbing the
planet.”

Rivers shape the terrain and lives of people by its waters which are
always in a dynamic state. Breaking this dynamic would unleash forces
of uncontrolled change and invite the ‘law of unintended
consequences’. Let’s remember the terrible Aral Sea disasters in which
two Siberian rivers were diverted.

Certainly, if water scarcity is the perennial question, aren’t there
better answers available?

By Gopal Krishna

This article has been published on thecitizen.in

For Details:
Gopal Krishna
ToxicsWatch Alliance (TWA)
Mb: 08227816731, 09818089660
E-mail:[email protected]
Web: www.toxicswatch.org

-- 
You received this message because you are subscribed to the Google Groups 
"Green Youth Movement" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send an email to [email protected].
Visit this group at http://groups.google.com/group/greenyouth.
For more options, visit https://groups.google.com/d/optout.

Reply via email to