Press Statement

NGT verdict on Jindal’s hazardous Okhla ‘waste to energy’ plant fails
to give relief to residents and birds of Delhi & UP

Verdict is myopic, unscientific, anti-environment and anti-public health

At last National Green Tribunal (NGT) gave its verdict on February 2,
2017 after its penultimate order of January 16, 2017 holding
Respondent No. 9 M/s. Jindal Urban Infrastructure Ltd. guilty of acts
of omission and commission but failed to give relief to
the residents and birds of Okhla, Delhi and Okhla Birds Sanctuary,
Uttar Pradesh. Prior to this NGT had passed a detailed order on March
11, 2013. It was recorded that “the foremost question that needs be
answered is whether or not the Plant is causing environmental problems
and is releasing hazardous discharge/emissions which would be
injurious to the health of the residents of the colonies in the
vicinity of the project site.” This has been mentioned in the verdict
dated February 2, 2017.The verdict is myopic, unscientific,
anti-environment and anti-public health.

The verdict records that State of UP has primarily concerned itself
with Okhla Birds Sanctuary which is located in the Capital Region of
Delhi (NCR). It is located at a point where River Yamuna leaves the
territory of Delhi and enters the State of UP. One of the most
prominent features of this site is a large lake created by the
construction of a barrage on the River Yamuna adjoining Okhla village
towards the West and Gautam Budh Nagar towards the East.

It fails to provide remedy to the birds. UP Government has declared
400 hectares of land to be protected land and further, as the Okhla
Birds Sanctuary under Section 18 of the
Wildlife (Protection) Act, 1972. In terms of the provisions of this
Act, obligations are placed upon the persons not to destroy, exploit
or remove any wild life from national parks and also, to not carry out
activities which are not allowed in that area.

>From page no. 137 to 142, paragraph 60, the verdict provides its
orders and directions in the matter of mixed waste incineration based
power plant of Jindal Urban Infrastructure Ltd (Sukhdev Vihar
Residents Welfare Association & others V State of NCT of Delhi &
others).  It reads as under:

For the reasons afore recorded and in the interest of public health
and environment, we issue the following order and directions:

1. We hold that the claim of the applicants in so far as it challenges
the Environmental Clearance granted to the Project Proponent by
MoEF&CC vide its order dated 21st April, 2007, is barred by time.
Thus, for that reason and even for additional reasons stated in the
judgment, we dismiss this claim of the applicant.
2. The objection of the respondent that even the other reliefs claimed
by the applicants are barred by limitation under the provisions of the
NGT Act, is untenable and is therefore rejected. These prayers of the
applicant have been dealt with on merits and answered by the Tribunal
in this judgment.
3. For the pollution resulting from deficient functioning/operation of
‘Waste to Energy Plant’ and its Stack emissions being in excess of
prescribed parameters up to the period of 18th December 2014, we hold
that the Project Proponent is liable to pay Environmental Compensation
of Rs. 25 Lakhs in terms of Section 15 & 17 of the NGT Act, which
shall be payable to the CPCB and DPCC in equal shares. The said amount
would be utilized for prevention and control of air pollution in that
area, subject, to the orders of the Tribunal. The ‘Waste to Energy
Plant’ would be permitted to operate till further orders of the
Tribunal and/or CPCB/DPCC, as the case may be. The plant shall operate
to its optimum capacity and would not cause any environmental
pollution. In other words, its emissions should be strictly compliant
with the prescribed standards imposed by CPCB/DPCC in the Consent to
Operate/Joint Inspection Reports, whichever is more stringent. The
plant will be permitted to operate subject to the stringent standards
and regular inspections and monitoring by the Joint Inspection Team
constituted by the Tribunal vide its order dated 13th March, 2013.
4. Joint Inspection Team shall conduct monthly inspections, while one
would be a surprise inspection and other monthly inspection would be
upon giving notice to the Project Proponent. In other words, there
will not be more than one inspection in a month. A detailed and
comprehensive inspection report shall be prepared by the Joint
Inspection Team and be submitted to this Tribunal for appropriate
directions. The Joint Inspection Team shall take Stack as well as
Ambient Air Quality samples and analyze the same in two different
laboratories i.e.,
CPCB and DPCC laboratories. The Project Proponent should construct an
automatic segregation plant, operative within one week from the date
of pronouncement of judgment, if not, made
operative by 31st January, 2017. The inspecting team shall carry out
detailed inspection and record its findings in relation to proper
segregation of waste strictly in accordance with the
Solid Waste Management Rules of 2016, initially for a period of one
year and if the plant is found to be complying in all respects, then
the Joint Inspection Team is to conduct inspections once in three
months.
5. In the event, the plant is found to be deficient in its operations
or violates the prescribed standards of emissions, it would be liable
to pay Environmental Compensation of Rs. 5 Lakhs per incident, in
addition to such other order or directions that may be passed by the
regulatory authorities and/or this Tribunal including closure of the
plant. One technical expert representing the applicant would be
entitled to participate both in the surprise as well as inspections
upon notice by the Joint Inspection Team. The joint inspection team
shall make its recommendations to the Tribunal identifying the
deficiencies/violations of parameters and their environmental impact.
Environmental compensation of Rs. 5 Lakh would be payable subject to
the orders of the Tribunal.
6. The Joint Inspection Team shall collect samples from the locations
at regular intervals in all directions of the plant and would analyse
the same.
7. The Project Proponent would ensure that its brick manufacturing
plant, utilizing the fly/bottom ash is operative to its optimum
capacity. Thus, every effort would be made to minimise the transport
of fly/bottom ash generated from the ‘Waste to Energy Plant’ to a
landfill site. The transportation of fly/bottom ash shall be carried
out strictly in accordance with the Rules while ensuring that there is
no fugitive release of ash into the air either during the loading,
unloading and transportation.
We direct the NCT of Delhi and all local authorities in NCT Delhi to
make it mandatory for all construction projects (public or private) to
use the bricks manufactured from fly ash in their
construction activities. Every effort should be made by all government
authorities including DPCC to popularise the use of ash bricks and to
provide incentives, thereof. The Government
of NCT Delhi, DPCC, joint inspection team and other concerned
authorities would issue clear directions with regard to utilisation of
fly ash bricks in construction and allied activities, quality,
quantity and percentage of such use.
8. The CPCB, DPCC & MoEF&CC shall direct the NCT Delhi as well as all
the concerned local authorities to provide more landfill sites in
Delhi and such sanitary landfill sites should be
maintained and utilized strictly in accordance with the Solid Waste
Management Rules of 2016.
9. The Tribunal having dealt with the issue of MSW in NCT Delhi in
different cases, particularly Almitra H. Patel, Kudrat Sandhu and the
present case is of the considered opinion that NCT
Delhi, local authorities and even the Central Government should make
contribution in all respects to ensure establishment of more ‘Waste to
Energy Plant’ at appropriate sites and strictly in accordance with the
Rules of 2016. This direction is necessitated for the reason that
nearly 8300 MT of MSW will still be dumped at different sites as is
being done presently.
10. Existing landfill sites should be improved, their heights should
immediately be reduced and bio-stabilization of all the landfill sites
should be expedited. The re-usable material particularly
inert and plastic waste should be recovered and utilized for
construction of roads (National Highways) and embankments in NCT of
Delhi or any other area.
11. We direct that the plant should have online monitoring system
which should be linked to the websites of CPCB and DPCC. Furthermore,
outside its premises, the project proponent shall
provide a link to the online system in the public domain to enable the
public at large including the applicants to know the emission
standards and day-to-day functioning of the plant.
12. DPCC shall issue appropriate directions to all the local
authorities to ensure segregation of the MSW at source. The C&D waste
collected at dhallos or at source should strictly be transported to
C&D Plant at Shastri Park and Burari.
13. The Project Proponent is hereby directed to improve the green belt
by planting trees all around the site. It should also improve the
green area which is part of the project site itself.
14. We direct that the terms, conditions and directions passed in the
judgment of this Tribunal in the cases of Kudrat Sandhu and Almitra H.
Patel (supra) shall mutatis mutandis apply to the project in question
as well.

61. The Original Application No. 22 (THC) of 2013 is disposed of in
terms of the order and directions contained in paragraph no. 60 of
this judgment. Consequently, M.A. No. 19 of 2014 does not survive for
consideration and is accordingly disposed of.

At p. 44, paragraph 32, the verdict records: “Government of NCT, Delhi
had not raised any serious dispute with regard to the facts stated in
the affidavit filed on behalf of the project proponent and, in fact,
was quite in consonance with the stand taken by the DPCC.”

At p. 49, paragraph 35 it is recorded: “The DPCC itself had no
facility to monitor emission relating to dioxin/furans.”

After recording such incompetence of DPCC and Delhi Government, NGT
recommends similar plants for besides Waste to Energy Plants at Bawana
(Narela) and Ghazipur. It directed the Narela and Ghazipur Waste to
Energy plant to operate to their optimum capacity in accordance with
law.

NGT verdict deprecates the concept of ‘Not in my backyard’ which has
to be subservient to processing of waste in accordance with the Rules
in the public interest but fails to accord priority to public health
despite recording the violations of norms by the Jindal's plant.

ToxicsWatch Alliance (TWA) which has been involved in the matter from
the very outset will release a detailed analysis of the 142 page long
verdict and the affidavits of government of NCT of Delhi, DPCC, DDA,
New Delhi Municipal Corporation and South Delhi Municipal Corporation
(SDMC) besides MoEFCC and UP in due course. In this regard the role of
SDMC, Government of UP and UNFCCC’s CDMEB will be significant in the
days to come.

Most of the respondents including New Delhi Municipal Corporation and
South Delhi Municipal Corporation (SDMC) have referred to an
irrelevant order of Supreme Court dated 15th February, 2000 for
setting up of eight numbers of Compost/Processing Plants for
disposal/processing of MSW in Delhi. This order is not relevant
because Court has passed relevant orders in May 2005 and May 2007. The
last order of the Supreme Court is the law of the land not its older
orders. NGT turns a blind eye to violation of Supreme Court's orders
despite referring to it while citing Delhi High Court's orders.

It ignores scientific studies regarding the composition of the waste
and its chemical characteristics create a compelling logic against
waste incineration either through RDF or any other incineration
technology. Indian municipal waste has 25.2 % moisture content and
23.4 % organic matter and 40.03 % ash and inert matter. In such a
situation, the proposals for waste incinerators appear to be subsidy
cornering initiatives which got stayed by the Supreme Court of India.
The Supreme Court’s order dated May 6, 2005 wherein it said, “…we hope
that till the position is clear, the Government would not sanction any
further subsidies” [16].  It is noteworthy that on May 15, 2007, the
Court’s order "permit (s) Ministry of Non-conventional Energy Sources
(MNES) to go ahead for the time being with 5 pilot projects chosen by
them" but it is noteworthy that this refers specifically to
bio-methanation technology. MNES has been renamed as MNRE (Union
Ministry of new and renewable energy).

It ends up blaming the victims and accepting the construction and
operation of the questionable plant as fait accompli.

For Details*: Gopal Krishna, ToxicsWatch Alliance (TWA), Mb: 9818089660,
08227816731, E-mail: krishna1715@*gmail.com <http://gmail.com*, Web:
 www.toxicswatch.org

-- 
You received this message because you are subscribed to the Google Groups 
"Green Youth Movement" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send an email to [email protected].
Visit this group at https://groups.google.com/group/greenyouth.
For more options, visit https://groups.google.com/d/optout.

Reply via email to