HI, I have four tiddlers with 20.000 ft 30.000 ft 40.000 ft and 50.000 ft.
These are just tiddlers with the tag Horizon. I review these on a projects dashboards by horizon. But this shows all my projects eventhough there is no Horizon assigned. I want to make a tiddler or dashboard where i can visualize the connections. Because a 50.000 items leads to 40.000 items or 30.000 items or 20.000 items. How i can i do this? So you get someting like this: 50.000 item 1 -> 40.000 item 1 -> 30.000 item 1 -> 40.000 item 2 -> 20.000 item 1 50.000 item 2 -> 20.000 item 2 etc etc etc So you get a track off items which are necessary to complete a life / longterm goal -- You received this message because you are subscribed to the Google Groups "GTD TiddlyWiki" group. To post to this group, send email to gtd-tiddlywiki@googlegroups.com. To unsubscribe from this group, send email to gtd-tiddlywiki+unsubscr...@googlegroups.com. For more options, visit this group at http://groups.google.com/group/gtd-tiddlywiki?hl=en.