limit running tasks per job
---------------------------

                 Key: HADOOP-2573
                 URL: https://issues.apache.org/jira/browse/HADOOP-2573
             Project: Hadoop
          Issue Type: New Feature
          Components: mapred
            Reporter: Doug Cutting
             Fix For: 0.17.0


It should be possible to specify a limit to the number of tasks per job 
permitted to run simultaneously.  If, for example, you have a cluster of 50 
nodes, with 100 map task slots and 100 reduce task slots, and the configured 
limit is 25 simultaneous tasks/job, then four or more jobs will be able to run 
at a time.  This will permit short jobs to pass longer-running jobs.  This also 
avoids some problems we've seen with HOD, where nodes are underutilized in 
their tail, and it should permit improved input locality.



-- 