limit running tasks per job
---------------------------
Key: HADOOP-2573
URL: https://issues.apache.org/jira/browse/HADOOP-2573
Project: Hadoop
Issue Type: New Feature
Components: mapred
Reporter: Doug Cutting
Fix For: 0.17.0
It should be possible to specify a limit to the number of tasks per job
permitted to run simultaneously. If, for example, you have a cluster of 50
nodes, with 100 map task slots and 100 reduce task slots, and the configured
limit is 25 simultaneous tasks/job, then four or more jobs will be able to run
at a time. This will permit short jobs to pass longer-running jobs. This also
avoids some problems we've seen with HOD, where nodes are underutilized in
their tail, and it should permit improved input locality.
--