So, the bsp() method is called once per whole job ? I thought that one superstep = one bsp() call. I'm trying to find an example when the bsp() method is called more than once on each node.
Thanks. 2011/2/15 Edward J. Yoon <[email protected]> > You can understand it as a barrier count. After all peers have entered > the barrier using sync() method, the system proceeds to the next > superstep. > > And, even if queues are empty, the bsp job won't stop until each > processes terminated. In SerializePrinting example case, the program > will be finished after the for loop is done and the count of > supersteps is same with a number of peers. > > Thanks. > >
