2 of the 4 CBU towers have been removed and in speaking with the engineer
responsible for the site, he told me they suspect the pattern has changed,
but are waiting on some technical studies to be completed to say for sure
just how much it has changed.

With 2 less towers and 25kw instead of 50kw, I'd there will be a change.

Paul



>
>
>
_
Hard-Core-DX mailing list
Hard-Core-DX@hard-core-dx.com
http://montreal.kotalampi.com/mailman/listinfo/hard-core-dx
http://www.hard-core-dx.com/
_______________________________________________

THE INFORMATION IN THIS ARTICLE IS FREE. It may be copied, distributed
and/or modified under the conditions set down in the Design Science License
published by Michael Stutz at
http://www.gnu.org/licenses/dsl.html

Reply via email to