Due to flooding, the nighttime pattern switching failed and they've
requested an Special Temporary Authority to operate with 1250 Watts Non
Directional from the single daytime non directional tower. I don't see a
date this is effective to but theyre usually for at least 30-60 days
minimum but often longer. This might make them easier to catch for some.  A
directional station can request an STA to operate non directionally and
usually gets 25 percent of its licensed directional power for non
directional operation.

Paul
_
Hard-Core-DX mailing list
Hard-Core-DX@hard-core-dx.com
http://montreal.kotalampi.com/mailman/listinfo/hard-core-dx
http://www.hard-core-dx.com/
_______________________________________________

THE INFORMATION IN THIS ARTICLE IS FREE. It may be copied, distributed
and/or modified under the conditions set down in the Design Science License
published by Michael Stutz at
http://www.gnu.org/licenses/dsl.html

Reply via email to