Due to flooding, the nighttime pattern switching failed and they've requested an Special Temporary Authority to operate with 1250 Watts Non Directional from the single daytime non directional tower. I don't see a date this is effective to but theyre usually for at least 30-60 days minimum but often longer. This might make them easier to catch for some. A directional station can request an STA to operate non directionally and usually gets 25 percent of its licensed directional power for non directional operation.
Paul _ Hard-Core-DX mailing list Hard-Core-DX@hard-core-dx.com http://montreal.kotalampi.com/mailman/listinfo/hard-core-dx http://www.hard-core-dx.com/ _______________________________________________ THE INFORMATION IN THIS ARTICLE IS FREE. It may be copied, distributed and/or modified under the conditions set down in the Design Science License published by Michael Stutz at http://www.gnu.org/licenses/dsl.html