https://issues.apache.org/jira/browse/HBASE-921?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12650747#action_12650747
]
Andrew Purtell commented on HBASE-921:
--------------------------------------
The problem is that META has out of date information on where the region is
located, due to the master leaving server location information in META in an
incorrect state for whatever reason. This is a problem with region
(re)assignment. The master is not adequately testing its view of region
assignments against the reality.
I think either Jim Firby's suggestion should be implemented or the additional
information in HSL if that patch for HBASE-1018 should be used. Either option
allows the master to get feedback on region assignment state from the
regionservers.
> region close and open processed out of order; makes for disagreement between
> master and regionserver on region state
> --------------------------------------------------------------------------------------------------------------------
>
> Key: HBASE-921
> URL: https://issues.apache.org/jira/browse/HBASE-921
> Project: Hadoop HBase
> Issue Type: Sub-task
> Affects Versions: 0.18.0
> Reporter: stack
> Priority: Blocker
> Fix For: 0.18.1, 0.19.0
>
> Attachments: 921-0.18.0.patch
>
>
> Master assigns region X successfully. It then decides to close it because it
> wants it opened elsewhere as part of region rebalancing. Both the open and
> close operations are reported back to the master. Both have operation
> processing components that are added to the todo list to be processed in
> another thread outside of the master's main loop.
> The close operation does the bulk of its work inline with the master main
> processing loop. Its todo component does some work if the region is offlined
> but otherwise nothing of consequence whereas the open in its todo does the
> important meta catalog table update with the new location information.
> Its been fairly common here on our cluster where the master todo queue is
> occupied processing the shutdown of a regionserver. It takes a long time to
> process the shutdown of a regionserver when thousands of regions This
> latter delays the processing of the open and close todos. In effect the open
> is running after the close. The region goes into limbo. Only a restart of
> the 'hosting' regionserver 'fixes' this state.
> This is a particular case of the general HBASE-543 issue. Its happening alot
> here on our cluster so will hack up a fix for this and get it into TRUNK and
> backport it to 0.18.1.
> Jim Firby here had a good idea for conditions like this. Clients should be
> able to say "I've asked for a regions location 10 times now and Mr. Master,
> you've given me the same response ten times in a row and each time, the
> answer was wrong. Revisit any notion that said region is at said location".
> Mr. Master would then go off and do something drastic like close and reassign
> the region.
--
This message is automatically generated by JIRA.
-