If splitting up HBASE-1249 in it's smaller parts and starting with HBASE-1304 which is the client-server changes I don't think it is going to be too long before I have tested the basic setup and have that under control, after that I need to add some extra caller methods but the infrastructure will stay the same, so it is not going to take too much time. Going to HBASE-880 which is a pretty big issue itself can be done pretty quickly once we have reached an agreement on how it will look, the coding itself is as far as I can tell pretty strait forward.
I would really like to see this as a part of 0.20 and we are doing everything we can to make that happen. I think that is would be nice to have a meeting so we can discuss and talk about these big changes, I will gladely make a 30 minute talk or something to explain what has been done and the reasoning around those changes. So the way I see it, from our point of view, we can probably get 0.20 out the door a week after that meeting, so maybe a week and a half after Stack gets back. Regards Erik > >
