[ https://issues.apache.org/jira/browse/HDFS-5579?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Jing Zhao updated HDFS-5579: ---------------------------- Status: Patch Available (was: Open) > Under construction files make DataNode decommission take very long hours > ------------------------------------------------------------------------ > > Key: HDFS-5579 > URL: https://issues.apache.org/jira/browse/HDFS-5579 > Project: Hadoop HDFS > Issue Type: Bug > Components: namenode > Affects Versions: 2.2.0, 1.2.0 > Reporter: zhaoyunjiong > Assignee: zhaoyunjiong > Attachments: HDFS-5579-branch-1.2.patch, HDFS-5579.patch > > > We noticed that some times decommission DataNodes takes very long time, even > exceeds 100 hours. > After check the code, I found that in > BlockManager:computeReplicationWorkForBlocks(List<List<Block>> > blocksToReplicate) it won't replicate blocks which belongs to under > construction files, however in > BlockManager:isReplicationInProgress(DatanodeDescriptor srcNode), if there > is block need replicate no matter whether it belongs to under construction or > not, the decommission progress will continue running. > That's the reason some time the decommission takes very long time. -- This message was sent by Atlassian JIRA (v6.1.4#6159)