[
https://issues.apache.org/jira/browse/HDFS-5138?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13874662#comment-13874662
]
Hadoop QA commented on HDFS-5138:
---------------------------------
{color:green}+1 overall{color}. Here are the results of testing the latest
attachment
http://issues.apache.org/jira/secure/attachment/12623607/HDFS-5138.patch
against trunk revision .
{color:green}+1 @author{color}. The patch does not contain any @author
tags.
{color:green}+1 tests included{color}. The patch appears to include 10 new
or modified test files.
{color:green}+1 javac{color}. The applied patch does not increase the
total number of javac compiler warnings.
{color:green}+1 javadoc{color}. The javadoc tool did not generate any
warning messages.
{color:green}+1 eclipse:eclipse{color}. The patch built with
eclipse:eclipse.
{color:green}+1 findbugs{color}. The patch does not introduce any new
Findbugs (version 1.3.9) warnings.
{color:green}+1 release audit{color}. The applied patch does not increase
the total number of release audit warnings.
{color:green}+1 core tests{color}. The patch passed unit tests in
hadoop-hdfs-project/hadoop-hdfs
hadoop-hdfs-project/hadoop-hdfs/src/contrib/bkjournal.
{color:green}+1 contrib tests{color}. The patch passed contrib unit tests.
Test results:
https://builds.apache.org/job/PreCommit-HDFS-Build/5911//testReport/
Console output: https://builds.apache.org/job/PreCommit-HDFS-Build/5911//console
This message is automatically generated.
> Support HDFS upgrade in HA
> --------------------------
>
> Key: HDFS-5138
> URL: https://issues.apache.org/jira/browse/HDFS-5138
> Project: Hadoop HDFS
> Issue Type: Bug
> Affects Versions: 2.1.1-beta
> Reporter: Kihwal Lee
> Assignee: Aaron T. Myers
> Priority: Blocker
> Attachments: HDFS-5138.patch, HDFS-5138.patch, HDFS-5138.patch,
> HDFS-5138.patch, HDFS-5138.patch, HDFS-5138.patch, HDFS-5138.patch,
> HDFS-5138.patch, HDFS-5138.patch, HDFS-5138.patch, HDFS-5138.patch
>
>
> With HA enabled, NN wo't start with "-upgrade". Since there has been a layout
> version change between 2.0.x and 2.1.x, starting NN in upgrade mode was
> necessary when deploying 2.1.x to an existing 2.0.x cluster. But the only way
> to get around this was to disable HA and upgrade.
> The NN and the cluster cannot be flipped back to HA until the upgrade is
> finalized. If HA is disabled only on NN for layout upgrade and HA is turned
> back on without involving DNs, things will work, but finaliizeUpgrade won't
> work (the NN is in HA and it cannot be in upgrade mode) and DN's upgrade
> snapshots won't get removed.
> We will need a different ways of doing layout upgrade and upgrade snapshot.
> I am marking this as a 2.1.1-beta blocker based on feedback from others. If
> there is a reasonable workaround that does not increase maintenance window
> greatly, we can lower its priority from blocker to critical.
--
This message was sent by Atlassian JIRA
(v6.1.5#6160)