LOGISTICS: Time: noon Eastern (16:00 UTC) U.S. Dial-in: 1-866-362-7064 / 89-2048#

AGENDA

1) [Brian] HIGGINS 1.1M7 BUILD COMPLETE
Build complete on August 25 [1]
Clean-up of links underway to point to latest builds

2) [Paul] PROPOSAL TO HAVE  COMPONENT WIKI AND COMPONENT PHP BUILD PAGES
Alternate approach to [282699]
Leave the components pages alone (except remove the LEDs)
Change [2] in the following ways:
Add in all of the missing components that didn’t build correctly, and put red LEDs on them (in the appropriate column). Delete the text in the “Links” and “Downloads” sections (for now)-- better to have nothing, then wrong/misleading text.

3) [Markus] REVIEW OF NEW IDAS CLIENT  [3]

[1] http://wiki.eclipse.org/Higgins_1.1M7
[282699] https://bugs.eclipse.org/bugs/show_bug.cgi?id=282699
[2] http://www.eclipse.org/higgins/components.php?loc=downloads
[3] org.eclipse.higgins.idas.client


Brian Walker
[email protected]
VP of Engineering
Azigo
www.azigo.com



_______________________________________________
higgins-dev mailing list
[email protected]
https://dev.eclipse.org/mailman/listinfo/higgins-dev

Reply via email to