Jadi sekarang CoW ada lagi..??
RUU Pertamangan yg belum selesai2 itu sudah disahkan...?
atau dibahas terus...?

Mas SP piye kuwi..??

BS


==============Original message text===============
On Wed, 05 Nov 2008 16:50:58 +1000 "S. (Daru) Prihatmoko" wrote:

Sepertinya ini KK pertama yang disetujui setelah rombongan yang terakhir KK
Generasi 7 sepuluh tahun lewat (1998). 

 

SP

===========================================

 

SIARAN PERS

Penandatanganan Kontrak Karya PT Jogja Magasa Iron

SELASA, 04 NOVEMBER 2008 16:12 WIB


DEPARTEMEN ENERGI DAN SUMBER DAYA MINERAL 
REPUBLIK INDONESIA
SIARAN PERS
NOMOR : 64/HUMAS DESDM/2008
Tanggal : 4 November 2008

PENANDATANGANAN KONTRAK KARYA PT JOGJA MAGASA IRON


Pada hari ini Selasa, 4 November 2008 telah dilakukan penandatanganan
Kontrak Karya antara Pemerintah Republik Indonesia dan PT Jogja Magasa Iron
untuk mengusahakan bahan galian pasir besi di Kabupaten Kulon Progo,
Provinsi Daerah Istimewa Yogyakarta dengan mengembangkan "Integrated Iron
Making Industry". 

Kontrak Karya ini adalah yang pertama kali di Pulau Jawa dan merupakan
investasi pertama sejak terjadinya krisis ekonomi serta penyelenggaraan
otonomi daerah.

Naskah Kontrak Karya tersebut telah mendapat rekomendasi dari Badan
Koordinasi Penanaman Modal dan telah dikonsultasikan dengan Dewan Perwakilan
Rakyat Republik Indonesia.

Komposisi kepemilikan saham PT Jogja Magasa Iron adalah PT Jogja Magasa
Mining (Indonesia) sebesar 30% dan Indo Mines Limited (Australia) sebesar
70%. 

Cadangan besi yang terdapat dalam pasir besi sebesar 33,6 juta ton Fe dengan
produksi sekitar 1 juta ton per tahun. Cadangan besi diperoleh dari
konsentrat pasir besi. Proyek ini akan menambang bahan galian pasir besi
(iron sand) dengan sistem tambang terbuka untuk diolah melalui proses
konsentrasi dan smelting untuk memproduksi pig iron (besi kasar) dengan
kandungan Fe>94%.

Perusahaan akan memulai kegiatan penambangan pada tahun 2011 dan mulai
memproduksi pig iron pada tahun 2012. Pada Tahap Konstruksi, perusahaan akan
menyerap tenaga kerja lokal sebanyak 5000 orang dan pada tahap awal produksi
akan mempekerjakan tenaga kerja lokal sebanyak 3000 orang.

Total investasi sebesar USD 1.1 milyar antara lain berupa stock pile USD 5
juta, pemasangan rel (rail sliding) USD 6 juta, pembangkit listrik 350 MW
senilai USD 350 juta dan fasilitas pelabuhan USD 10 juta dan investasi
pertambangan sebesar USD 600 juta. Diharapkan proyek ini akan menyumbang
Penerimaan Negara dari sisi pajak sekitar USD 20 juta/tahun, royalty sebesar
USD 11,25 juta/tahun, pendanaan lokal USD 7 juta/tahun dan operating
expenditure USD 55 juta/tahun.

PT Jogja Magasa Iron pada 10 tahun pertama akan memberikan kontribusi ke
daerah (Kabupaten) sebesar 1,5% dari penjualan masing-masing untuk Regional
Development dan Community Development dan setelah 10 tahun meningkat menjadi
sebesar 2%.


Plt. Kepala Biro Hukum dan Humas
Kepala Bagian Penelaahan Hukum

Robert A. John

(ADMINISTRATOR)

 

 

  _____  

From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Bosta Pratama
Sent: Wednesday, November 05, 2008 1:26 PM
To: [EMAIL PROTECTED]
Subject: Re: [economicgeology] Fw: iron sand jogjakarta

 


Indo Mines gets Jogjakarta approval


  <http://media.aspermont.com.au/web_images/grey.gif> 


Wednesday, 5 November 2008

SHARES in Indo Mines have soared more than 56% today after the company
received contract of works approval from the Indonesian government to
develop the $US600 million ($A870 million) Jogjakarta liquid iron project on
the Indonesian island of Java.


 <http://www.miningnews.net/StoryView.asp?StoryID=470038> 

 


Work at Yogyakarta ironsands project in Java, Indonesia

The Perth-based company said the mining licence was the highest level of
approval required for the project's development and provided long-term
security of tenure. 

The company's share price jumped as much as 21c to an intraday high of 58c
on the back of the news. 

"This is a major milestone and step toward production for Indo Mines and the
project has the potential to become one of the lowest-cost liquid iron
producers in the world," Indo Mines said. 

The company said the contract of works was the first of its type to be
granted to an international company in more than 10 years and the first ever
to be granted in Java. 

Indo Mines managing director Phil Welten said receipt of this approval was a
key to securing foreign investment support and allowed the company to
proceed with confidence to the next phase of development and the completion
of a feasibility study by the second half of next year. 

The project has a JORC iron sands mineral resource of 605 million tonnes and
a mine life of at least 30 years.

A scoping study has identified that the simple shallow mining operation, the
availability of low-cost thermal coal required for the reduction process and
the processing facility being located on the minesite adjacent to existing
rail and power infrastructure, resulted in operating costs of around $US150
per tonne of pig iron. 

Promet Engineers are updating the scoping study with the positive impact an
increase in the price of liquid iron from $US300/t to around $500-600/t will
have on the company's financials.

Shares in Indo Mines have since cooled to 49c in afternoon trading.

__._,_.___ 

Messages
<http://groups.yahoo.com/group/economicgeology/message/1352;_ylc=X3oDMTM1b2ZtcHFvBF9TAzk3MzU5NzE0BGdycElkAzIwMDEwMzE5BGdycHNwSWQDMTcwNzIxNjk3NwRtc2dJZAM
xMzUyBHNlYwNmdHIEc2xrA3Z0cGMEc3RpbWUDMTIyNTg2NjM3MgR0cGNJZAMxMzUy>  in this
topic (1)
<http://groups.yahoo.com/group/economicgeology/post;_ylc=X3oDMTJxZXRmb25jBF9TAzk3MzU5NzE0BGdycElkAzIwMDEwMzE5BGdycHNwSWQDMTcwNzIxNjk3NwRtc2dJZAMxMzUyBHN
lYwNmdHIEc2xrA3JwbHkEc3RpbWUDMTIyNTg2NjM3Mg--?act=reply&messageNum=1352>
Reply (via web post) | Start
<http://groups.yahoo.com/group/economicgeology/post;_ylc=X3oDMTJmdTJwMjhxBF9TAzk3MzU5NzE0BGdycElkAzIwMDEwMzE5BGdycHNwSWQDMTcwNzIxNjk3NwRzZWMDZnRyBHNsawN
udHBjBHN0aW1lAzEyMjU4NjYzNzI->  a new topic 

Messages
<http://groups.yahoo.com/group/economicgeology/messages;_ylc=X3oDMTJmMDcza3EzBF9TAzk3MzU5NzE0BGdycElkAzIwMDEwMzE5BGdycHNwSWQDMTcwNzIxNjk3NwRzZWMDZnRyBHN
sawNtc2dzBHN0aW1lAzEyMjU4NjYzNzI->  | Files
<http://groups.yahoo.com/group/economicgeology/files;_ylc=X3oDMTJndnF0YnRkBF9TAzk3MzU5NzE0BGdycElkAzIwMDEwMzE5BGdycHNwSWQDMTcwNzIxNjk3NwRzZWMDZnRyBHNsaw
NmaWxlcwRzdGltZQMxMjI1ODY2Mzcy>  | Photos
<http://groups.yahoo.com/group/economicgeology/photos;_ylc=X3oDMTJmYWM5N3RwBF9TAzk3MzU5NzE0BGdycElkAzIwMDEwMzE5BGdycHNwSWQDMTcwNzIxNjk3NwRzZWMDZnRyBHNsa
wNwaG90BHN0aW1lAzEyMjU4NjYzNzI->  | Members
<http://groups.yahoo.com/group/economicgeology/members;_ylc=X3oDMTJmdmY4ajk1BF9TAzk3MzU5NzE0BGdycElkAzIwMDEwMzE5BGdycHNwSWQDMTcwNzIxNjk3NwRzZWMDZnRyBHNs
awNtYnJzBHN0aW1lAzEyMjU4NjYzNzI->  | Calendar
<http://groups.yahoo.com/group/economicgeology/calendar;_ylc=X3oDMTJlNGxsNmMxBF9TAzk3MzU5NzE0BGdycElkAzIwMDEwMzE5BGdycHNwSWQDMTcwNzIxNjk3NwRzZWMDZnRyBHN
sawNjYWwEc3RpbWUDMTIyNTg2NjM3Mg-->  

MARKETPLACE

  _____  

_ 

===========End of original message text===========



Bronto Sutopo
PhD Candidate
ARC Centre of Excellence in Ore Deposits, 
School of Earth Sciences, UTas
Hobart, Tasmania 7001
Australia
Phone  :+61-3-6226 2376
Fax      :+61-3-6226 7662
mobile :+61-438 518 165



--------------------------------------------------------------------------------
serah-terima pp-iagi: senin sore, 13 oktober 2008
ketua umum: LAMBOK HUTASOIT
sekjen: MOHAMMAD SYAIFUL
pasukan sedang disusun, hanya satu IAGI...
--------------------------------------------------------------------------------
ayo, segera pula siapkan utk PIT IAGI ke-38
dg tuan-rumah adalah PENGDA JATENG
* mungkin di semarang
* mungkin pula di solo
* mungkin juga join dg HAGI dll.
-----------------------------------------------------------------------------
To unsubscribe, send email to: iagi-net-unsubscribe[at]iagi.or.id
To subscribe, send email to: iagi-net-subscribe[at]iagi.or.id
Visit IAGI Website: http://iagi.or.id
Pembayaran iuran anggota ditujukan ke:
Bank Mandiri Cab. Wisma Alia Jakarta
No. Rek: 123 0085005314
Atas nama: Ikatan Ahli Geologi Indonesia (IAGI)
Bank BCA KCP. Manara Mulia
No. Rekening: 255-1088580
A/n: Shinta Damayanti
IAGI-net Archive 1: http://www.mail-archive.com/iagi-net%40iagi.or.id/
IAGI-net Archive 2: http://groups.yahoo.com/group/iagi
---------------------------------------------------------------------
DISCLAIMER: IAGI disclaims all warranties with regard to information posted on 
its mailing lists, whether posted by IAGI or others. In no event shall IAGI and 
its members be liable for any, including but not limited to direct or indirect 
damages, or damages of any kind whatsoever, resulting from loss of use, data or 
profits, arising out of or in connection with the use of any information posted 
on IAGI mailing list.
---------------------------------------------------------------------

Reply via email to