Apakah pada pltl dibawah ini oil shale yg dipakai sudah berbentuk oil atau proses oil shale menjadi oil dilakukan dipltl tsb.Just curious. si Abah
Attarat Power PlantFrom Wikipedia, the free encyclopedia | Attarat Power Plant | | Country | Jordan | | Location | Attarat Um Ghudran | | Status | Proposed | | Commission date | 2019 (expected) | | Owner(s) | Eesti Energia YTL Power International Near East Investments | | Operator(s) | Attarat Power Company | | Thermal power station | | Primary fuel | Oil shale | | Power generation | | Make and model | Siemens | | Units planned | 2 x 235 MW | | Nameplate capacity | 470 MW | Attarat Power Plant is a planned oil shale-fueled power plant in the Attarat UmGhudran areain Jordan. The concession agreement between the Ministry ofEnergy and Mineral Resources and National Electricity Power Companyof Jordan, and Estonian powercompany Eesti Energia (Enefit)was signed on 30 April 2008.[1][2] Theproject is developed in the partnership with YTL Power International and Near EastInvestments of Jordan, and will be operated by Attarat Power Company.[3][4] The power plantwill have a total capacity of 470 MW.[5][6] Itwill consist of two circulating-fluidized-bed units.[7] Theengineering,procurement and construction contractwas awarded to Guangdong Power Engineering Corporation, a subsidiary of ChinaEnergy Engineering Group. The power plant would be designed by WorleyParsons. It would use boilers provided by Foster Wheeler andthe turbine by Siemens.[8] Theproject will be cost US$1.6 billion[5][6] andwill be financed by $1.4 billion loan provided by the Bank of China andthe Industrial andCommercial Bank of China, and guaranteed by China Export andCredit Insurance Corporation.[6][8] A 30-year power purchaseagreement wassigned with Jordan in October 2014.[9] Theconstruction agreement was signed on 12 January 2016.[5] Theplant is expected to start operation in the second half of 2019.[5][6] Whenconstructed, it will be among the largest power plants in Jordan (the largestbeing Aqaba Thermal PowerStation), and the largest oil shale-fired power plant in the worldafter Narva Power Plants in Estonia.[10][11][12] The power plantwould consume 10 million tons of oil shale per year.[7] Overits 40-year lifetime it would need an oil-shale mining area of approximately 11square kilometres (4.2 sq mi).[4] ---------------------------------------------------- Geosea XIV and 45TH IAGI Annual Convention 2016 Bandung , October 10-13 2016 for further information please visit our website at http://geosea2016.iagi.or.id or email to secretar...@geosea2016.iagi.or.id ---------------------------------------------------- Iuran tahunan Rp.250.000,- (profesional) dan Rp.100.000,- (mahasiswa) Pembayaran iuran anggota ditujukan ke: Bank Mandiri Cab. Wisma Alia Jakarta (a/n IAGI) No. Rek: 123 0085005314 Bank BCA KCP. Manara Mulia (A/n: Shinta Damayanti) No. Rekening: 255-1088580 ---------------------------------------------------- Subscribe: iagi-net-subscr...@iagi.or.id Unsubscribe: iagi-net-unsubscr...@iagi.or.id ---------------------------------------------------- DISCLAIMER: IAGI disclaims all warranties with regard to information posted on its mailing lists, whether posted by IAGI or others. In no event shall IAGI or its members be liable for any, including but not limited to direct or indirect damages, or damages of any kind whatsoever, resulting from loss of use, data or profits, arising out of or in connection with the use of any information posted on IAGI mailing list.