At 11:40 PM +0300 on 7/4/10, Binyamin Dissen wrote about Re: ecb paramter on Attach:

On Sun, 4 Jul 2010 16:21:31 -0400 Joe Reichman <joereich...@optonline.net>
wrote:

:>Just to clarify the ECB= parameter on the Attach

:>Is posted when the Main Task does a DETACH

I don't know, but I don't think so.

But if you are DETACHing, why do you need to check the ECB?

To insure that the ATTACHed Task has completed. If you DETACH without the ECB being posted, that means that the ATTACHed task is still running thus causing the task to be ABENDed (which can mess up whatever it is doing such as File I/O).

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to lists...@bama.ua.edu with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to