JC, While there is nothing wrong with using the PPRC commands for HDS DASD, you may find it a lost faster and simpler to use the Business Continuity Manager (BCM) software.
A lot of features in TrueCopy (like At-Time) aren't available through the PPRC commands. Ron > -----Original Message----- > From: IBM Mainframe Discussion List [mailto:[EMAIL PROTECTED] On > Behalf Of JC Jung > Sent: Friday, 21 July 2006 9:01 PM > To: IBM-MAIN@BAMA.UA.EDU > Subject: Re: ANTP0102I ESTAB. PAIR FAILED- DEVICES NOT IN SUSPEND > > This problem resolved. > > It was found that it is 4096 not 8192 per consistency group. So we have > hit this maximum. For the cestpair commands the AG000 parameter should be > AG010 for consistency group 01. This has enabled another 4096 pairs which > will be in consistency group 1. > > > CESTPAIR DEVN(X'C5A9') PRIM(X'C005' AG000 X'A9' X'05') + > SEC(X'C805' 11462 X'A9' X'05') + > MODE(COPY) PACE(15) CRIT(NO) MSGREQ(NO) > > Where "AG000" parameter : > A = Asynchronous mode > G = Consistency group > "00" = Consistency group number. > "0" = Normal delay for command retry > > Hope it helps. > > Many thanks for help. JC > > ---------------------------------------------------------------------- > For IBM-MAIN subscribe / signoff / archive access instructions, > send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO > Search the archives at http://bama.ua.edu/archives/ibm-main.html ---------------------------------------------------------------------- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html