JC,

While there is nothing wrong with using the PPRC commands for HDS DASD, you
may find it a lost faster and simpler to use the Business Continuity Manager
(BCM) software.

A lot of features in TrueCopy (like At-Time) aren't available through the
PPRC commands.

Ron

> -----Original Message-----
> From: IBM Mainframe Discussion List [mailto:[EMAIL PROTECTED] On
> Behalf Of JC Jung
> Sent: Friday, 21 July 2006 9:01 PM
> To: IBM-MAIN@BAMA.UA.EDU
> Subject: Re: ANTP0102I ESTAB. PAIR FAILED- DEVICES NOT IN SUSPEND
> 
> This problem resolved.
> 
> It was found that it is 4096 not 8192 per consistency group. So we have
> hit this maximum. For the cestpair commands the AG000 parameter should be
> AG010 for consistency group 01. This has enabled another 4096 pairs which
> will be in consistency group 1.
> 
> 
>  CESTPAIR DEVN(X'C5A9') PRIM(X'C005' AG000 X'A9' X'05')               +
>  SEC(X'C805' 11462 X'A9' X'05')                                       +
>  MODE(COPY) PACE(15) CRIT(NO) MSGREQ(NO)
> 
> Where "AG000" parameter :
> A = Asynchronous mode
> G = Consistency group
> "00" = Consistency group number.
> "0" = Normal delay for command retry
> 
> Hope it helps.
> 
> Many thanks for help. JC
> 
> ----------------------------------------------------------------------
> For IBM-MAIN subscribe / signoff / archive access instructions,
> send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
> Search the archives at http://bama.ua.edu/archives/ibm-main.html

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to