David Eisenberg wrote:
The problem is that I have reached a practical limit of approximately 540 files in the folder, because when I reach that point, I get a dynamic concatenation ABEND due to the TIOT filling up. I am told that our TIOT size is the default of 32K, which would allow for a maximum of 1,635 DDs in a job step. It would seem, however, that something in my allocation/concatenation loop is preventing me from reaching that number of files. There are only a handful of other DDs allocated to the step (e.g., STEPLIB, etc).

Which abend code? Is there no dump? A dump will show you what's in the TIOT.

--
Edward E Jaffe
Phoenix Software International, Inc
5200 W Century Blvd, Suite 800
Los Angeles, CA 90045
310-338-0400 x318
[EMAIL PROTECTED]
http://www.phoenixsoftware.com/

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to