Lizette,

I sure hope that isn't true.  😊  If it is, my system hasn't been IPLed in 
years.  CEE.SCEERUN2 and TCPIP.SEZALOAD are 2 libraries close to the beginning 
of my PROG00 member, used at IPL.  My uneducated guess is that NIP opens 
SYS1.LINKLIB outside of finding it in PROG00 because this library is needed to 
start the SMSPDSE address space.  It then builds the full PROGxx concatenation 
for linklist processing after SMSPDSE is running.   

Rex

-----Original Message-----
From: IBM Mainframe Discussion List <[email protected]> On Behalf Of 
Lizette Koehler
Sent: Monday, February 2, 2026 9:03 AM
To: [email protected]
Subject: [EXTERNAL] Do you still have to add PDS/e separately at IPL in lnklst

I was told at IPL time that during nip My Link list should only contain PDS 
data sets. That PDSE data sets should be added later with a separate SETPROG 
command.

Is that still a true process?
I was told that in order to do rebuilds dynamically on the Link List containing 
PDSE's, it needs to be done shortly after nip processing.
If that is no longer true when did the restriction get lifted?

So PROG00 for nip only has pds datasets.

A Minute or two after nip I issue a command to rebuild lnklst and include PDS/e 
datasets in lnklst.

Lizette

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions, send email to 
[email protected] with the message: INFO IBM-MAIN

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: INFO IBM-MAIN

Reply via email to