I know that
Is there a way to disable to Peer to Peer relationship in batch so the job will 
work.

Gadi

-----Original Message-----
From: IBM Mainframe Discussion List [mailto:IBM-MAIN@LISTSERV.UA.EDU] On Behalf 
Of Carmen Vitullo
Sent: Thursday, November 30, 2017 3:29 PM
To: IBM-MAIN@LISTSERV.UA.EDU
Subject: Re: Problem after starting PPRC

A quick look it appears a Peer to Peer relationship was already established 
with the output volume your error message PPRC PRIM CURRENTLY ACTIVE ADR938E


RC 9 in the nice message guide sez



X'9'
One or more target devices are not eligible for fast replication at this time.


When DEBUG(FRMSG(SUMMARIZED)) is specified, return code X'9' is
followed by summarized volume information that consists of reason
codes that indicate why one or more volumes are not eligible. For
each reason code issued, the number of volumes failing for that
reason is provided. The reason codes include SDM QFRVOLS volume
reason codes (qfrvols_vrsn) and extent reason codes (qfrvols_xrsn).
You can use the DEVSRV (DS P) command to check any P-P relationship


Carmen Vitullo

----- Original Message -----

From: "גדי בן אבי" <gad...@malam.com>
To: IBM-MAIN@LISTSERV.UA.EDU
Sent: Thursday, November 30, 2017 6:22:11 AM
Subject: Problem after starting PPRC

Hi,

Yesterday we established PPRC (Global Mirror) relationships between our local 
DS8884 and our remote DS8884.
This is our first venture into the storage replication area.

We have a series of jobs that use flashcopy to copy a volume to a secondary 
volume, and then backu to secondary to tape. This is done using DFSMSdss.
The command looks like this:
COPY FULL ADMINISTRATOR INDYNAM(SCR016) OUTDYNAM(FLSH04) -
DUMPCONDITIONING FASTREPLICATION(REQUIRED) PURGE ALLDATA(*) -
ALLEXCP CANCELERROR
IF LASTCC = 0 THEN
DUMP FULL ADMIN INDYNAM(FLSH04) OUTDDNAME(OUTPUT) ALLDATA(*) -
ALLEXCP OPTIMIZE(4) CANCELERROR

When the jobs ran last night it returned:
PAGE 0001 5695-DF175 DFSMSDSS V2R01.0 DATA SET SERVICES 2017.334 05:29
COPY FULL ADMINISTRATOR INDYNAM(SCR016) OUTDYNAM(FLSH04) -
DUMPCONDITIONING FASTREPLICATION(REQUIRED) PURGE ALLDATA(*) -
ALLEXCP CANCELERROR
ADR101I (R/I)-RI01 (01), TASKID 001 HAS BEEN ASSIGNED TO COMMAND 'COPY '
IF LASTCC = 0 THEN
ADR101I (R/I)-RI01 (01), TASKID 002 HAS BEEN ASSIGNED TO COMMAND 'IF '
DUMP FULL ADMIN INDYNAM(FLSH04) OUTDDNAME(OUTPUT) ALLDATA(*) -
ALLEXCP OPTIMIZE(4) CANCELERROR
ADR101I (R/I)-RI01 (01), TASKID 003 HAS BEEN ASSIGNED TO COMMAND 'DUMP '
ADR109I (R/I)-RI01 (01), 2017.334 05:29:33 INITIAL SCAN OF USER CONTROL 
STATEMENTS COMPLETED
ADR016I (001)-PRIME(01), RACF LOGGING OPTION IN EFFECT FOR THIS TASK
ADR006I (001)-STEND(01), 2017.334 05:29:33 EXECUTION BEGINS
ADR918I (001)-DDTFP(03), FAST REPLICATION COULD NOT BE USED FOR VOLUME SCR016, 
RETURN CODE 9
1 VOLUME WAS REJECTED FOR QFRVOLS VOLUME REASON CODE 2 - PPRC PRIM CURRENTLY 
ACTIVE
ADR938E (001)-DDTFP(03), FASTREPLICATION(REQUIRED) WAS SPECIFIED BUT FAST 
REPLICATION COULD NOT BE USED FOR VOLUME SCR016
ADR006I (001)-STEND(02), 2017.334 05:29:33 EXECUTION ENDS
ADR013I (001)-CLTSK(01), 2017.334 05:29:33 TASK COMPLETED WITH RETURN CODE 0008
ADR016I (003)-PRIME(01), RACF LOGGING OPTION IN EFFECT FOR THIS TASK
ADR006I (003)-STEND(01), 2017.334 05:29:34 EXECUTION BEGINS
ADR006I (003)-STEND(02), 2017.334 05:51:15 EXECUTION ENDS
ADR013I (003)-CLTSK(01), 2017.334 05:51:15 TASK COMPLETED WITH RETURN CODE 0000
ADR012I (SCH)-DSSU (01), 2017.334 05:51:15 DFSMSDSS PROCESSING COMPLETE. 
HIGHEST RETURN CODE IS 0008 FROM:
TASK 001

From what I read, I have to remove the PPRC connection for the Flashcopy 
Target, and then reestablish it (maybe).

Am I correct?
How can I do this in batch, hopefully only specifying the VOLSER’s.

We are running z/OS v2.1

Thanks

Gadi
לתשומת ליבך, בהתאם לנהלי חברת מלם מערכות בע"מ ו/או כל חברת בת ו/או חברה קשורה 
שלה (להלן : "החברה") וזכויות החתימה בהן, כל הצעה, התחייבות או מצג מטעם החברה, 
מחייבים מסמך נפרד וחתום על ידי מורשי החתימה של החברה, הנושא את לוגו החברה או 
שמה המודפס ובצירוף חותמת החברה. בהעדר מסמך כאמור (לרבות מסמך סרוק) המצורף 
להודעת דואר אלקטרוני זאת, אין לראות באמור בהודעה אלא משום טיוטה לדיון, ואין 
להסתמך עליה לביצוע פעולה עסקית או משפטית כלשהי. Please note that in accordance 
with Malam and/or its subsidiaries (hereinafter : "Malam") regulations and 
signatory rights, no offer, agreement, concession or representation is binding 
on the Malam, unless accompanied by a duly signed separate document (or a 
scanned version thereof), affixed with the Malam seal.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to lists...@listserv.ua.edu with the message: INFO IBM-MAIN


----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to lists...@listserv.ua.edu with the message: INFO IBM-MAIN
לתשומת ליבך, בהתאם לנהלי חברת מלם מערכות בע"מ ו/או כל חברת בת ו/או חברה קשורה 
שלה (להלן : "החברה") וזכויות החתימה בהן, כל הצעה, התחייבות או מצג מטעם החברה, 
מחייבים מסמך נפרד וחתום על ידי מורשי החתימה של החברה, הנושא את לוגו החברה או 
שמה המודפס ובצירוף חותמת החברה. בהעדר מסמך כאמור (לרבות מסמך סרוק) המצורף 
להודעת דואר אלקטרוני זאת, אין לראות באמור בהודעה אלא משום טיוטה לדיון, ואין 
להסתמך עליה לביצוע פעולה עסקית או משפטית כלשהי. Please note that in accordance 
with Malam and/or its subsidiaries (hereinafter : "Malam") regulations and 
signatory rights, no offer, agreement, concession or representation is binding 
on the Malam, unless accompanied by a duly signed separate document (or a 
scanned version thereof), affixed with the Malam seal.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to lists...@listserv.ua.edu with the message: INFO IBM-MAIN

Reply via email to