Hi Mikolaj,

On Fri, Mar 21, 2025 at 03:02:49PM +0100, Mikolaj Wasiak wrote:
> Due to changes in allocator, the size of the allocation for

which change in the allocator?

> contiguous region is not rounded up to a power-of-two and
> instead allocated as is.

The allocator has always been rounded up instead of a power of
two round up.

> Thus, change the part of test that
> expected the allocation to fail.

Is the failure part of the test?

Andi

> Signed-off-by: Mikolaj Wasiak <[email protected]>

Reply via email to